Inspections for the day of: Monday, September 9, 2013.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Sly
TitleBLD-COM/RES INSPECTOR
Phone #794-9465
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD13-01480 BLD-Framing/Rough-in9/9/20139/9/20139/10/2013 11:23:10 AMPCANC
Kari Phone #: ###-####
Waiting on Mech rough-in approval.
BLD13-02177 BLD-Footing9/6/20139/9/20139/9/2013 5:04:56 PMPPASS
ryan Phone #: ###-####
BLD13-01536 BLD-Energy code compliance9/9/20139/9/20139/9/2013 4:56:35 PMPPASS
micah Phone #: ###-####
MIS13-00264 BLD-Conference9/6/20139/9/20139/9/2013 4:51:52 PMADONE
report that they are doing work before erosion permit is obtained

Correction notice issued at 4:30 on Monday Sept. 9. Contact City of Boise PDS Dept. by Wed. Sept 11 by 4:30 PM to finalize Erosion control permit......or Stop work order will be issued. You are scheduled for a re-inspection At 4:30 on Wed 11th. Chris Fox ...Dahle Constr. ###-####..
BLD13-02468 BLD-Framing/Rough-in9/6/20139/9/20139/9/2013 3:09:14 PMPPASS
JIMMY Phone #: ###-####
BLD12-01951 BLD-Conference9/6/20139/9/20139/9/2013 2:47:11 PMAPASS
john Phone #: ###-####
ESC13-00886 Site Preparation9/6/20139/9/20139/9/2013 11:39:02 AMAPASS
JIM Phone #: ###-####
Required waddles in place. Contr. wants to change location of staging area to the West side of road. Talked about lining the concrete washout with 6 mil. plastic. Sign posted......OK