BLD13-01480
| BLD-Framing/Rough-in | 9/9/2013 | 9/9/2013 | 9/10/2013 11:23:10 AM | P | CANC |
|
|
Kari Phone #: ###-#### Waiting on Mech rough-in approval.
|
BLD13-02177
| BLD-Footing | 9/6/2013 | 9/9/2013 | 9/9/2013 5:04:56 PM | P | PASS |
|
|
ryan Phone #: ###-####
|
BLD13-01536
| BLD-Energy code compliance | 9/9/2013 | 9/9/2013 | 9/9/2013 4:56:35 PM | P | PASS |
|
|
micah Phone #: ###-####
|
MIS13-00264
| BLD-Conference | 9/6/2013 | 9/9/2013 | 9/9/2013 4:51:52 PM | A | DONE |
|
|
report that they are doing work before erosion permit is obtained
Correction notice issued at 4:30 on Monday Sept. 9. Contact City of Boise PDS Dept. by Wed. Sept 11 by 4:30 PM to finalize Erosion control permit......or Stop work order will be issued. You are scheduled for a re-inspection At 4:30 on Wed 11th. Chris Fox ...Dahle Constr. ###-####..
|
BLD13-02468
| BLD-Framing/Rough-in | 9/6/2013 | 9/9/2013 | 9/9/2013 3:09:14 PM | P | PASS |
|
|
JIMMY Phone #: ###-####
|
BLD12-01951
| BLD-Conference | 9/6/2013 | 9/9/2013 | 9/9/2013 2:47:11 PM | A | PASS |
|
|
john Phone #: ###-####
|
ESC13-00886
| Site Preparation | 9/6/2013 | 9/9/2013 | 9/9/2013 11:39:02 AM | A | PASS |
|
|
JIM Phone #: ###-#### Required waddles in place. Contr. wants to change location of staging area to the West side of road. Talked about lining the concrete washout with 6 mil. plastic. Sign posted......OK
|