ELE12-00534
| ELE-Aging Inspection | 9/9/2014 | 9/9/2014 | 9/11/2014 3:58:28 PM | | DONE |
|
|
will be following up soon on this
|
ELE11-01137
| ELE-Aging Inspection | 9/9/2014 | 9/9/2014 | 9/11/2014 10:02:12 AM | | DONE |
|
|
too busy
|
ELE14-02477
| Final | 9/8/2014 | 9/9/2014 | 9/9/2014 3:42:20 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by danny perrine final ok
|
ELE14-02477
| Permanent Service | 9/9/2014 | 9/9/2014 | 9/9/2014 3:40:55 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by danny perrine p/s u/g rec ok (just need to reset meter)
|
ELE14-02503
| Conference | 9/9/2014 | 9/9/2014 | 9/9/2014 2:55:30 PM | P | DONE |
|
|
want walk through to discuss knob and tube wiring. please call to set time Phone #: ###-#### Inspection requested via web by Andy Rose discuss knob and tube replacement
|
ELE14-02464
| Rough-In Permanent Service | 9/8/2014 | 9/9/2014 | 9/9/2014 1:55:08 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Zane Robertson p/s u/g n ok r/i ok except for soffits and fireplace
|
ELE14-02415
| Final | 9/9/2014 | 9/9/2014 | 9/9/2014 1:18:19 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Andy Rose final ok
|
ELE14-02415
| Permanent Service | 9/9/2014 | 9/9/2014 | 9/9/2014 1:14:21 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Andy Rose p/s o/h rec ok ALREADY CONNECTED
|
ELE14-02031
| Electrical Rough-In | 9/9/2014 | 9/9/2014 | 9/9/2014 1:02:36 PM | P | PASS |
|
|
I need an inspection for floor boxes. Thank you, Stacie Phone #: ###-#### Inspection requested via web by Stacie Tasker r/i slab and floor boxes ok
|
ELE14-01682
| Electrical Rough-In | 9/9/2014 | 9/9/2014 | 9/9/2014 12:32:25 PM | P | PASS |
|
|
Ceiling inspection in bathrooms. Phone #: ###-#### Inspection requested via web by Spencer McLean r/i ok bathrooms and remainder of walls
|
ELE14-02494
| Temporary Service | 9/8/2014 | 9/9/2014 | 9/9/2014 11:06:03 AM | A | PASS |
|
|
Temp pole. Chris is contact. Thanks Phone #: ###-#### Inspection requested via web by Chris Chesnut t/s u/g n ok
|
ELE12-01075
| ELE-Aging Inspection | 9/9/2014 | 9/9/2014 | 9/9/2014 10:46:55 AM | | DONE |
|
|
spoke with steve reagan and he will look into it
|
ELE12-00213
| Electrical Rough-In | 9/8/2014 | 9/9/2014 | 9/9/2014 10:38:33 AM | A | PASS |
|
|
Dan Phone #: ###-#### r/i floorheat ok in bsmt. bath
|
ELE14-02325
| Electrical Rough-In | 9/8/2014 | 9/9/2014 | 9/9/2014 10:17:15 AM | A | FAIL |
|
|
Inspection for ufer ground Phone #: ###-#### Inspection requested via web by steve ragan NEC 250.52(A)(3)(2) #4 bare cu min for grounding electrode conductor
|
GCE14-00140
| GCE-Rough-In | 9/8/2014 | 9/9/2014 | 9/9/2014 9:48:59 AM | A | PASS |
|
|
Kevin ###-#### gate #0955 home addition accessible from street r/i ok
|
GCE13-00191
| GCE-Final | 9/8/2014 | 9/9/2014 | 9/9/2014 9:27:14 AM | A | PASS |
|
|
Don ###-#### Jackie ###-#### Final for rooms corrections made rms 140,142,144,147 and 148 final ok see rooms designated on wall plan
|