FIR14-00264
| INSP-Final Inspection | 9/9/2014 | 9/9/2014 | 9/9/2014 4:42:34 PM | P | PART |
|
|
Fire sprinkler work at phase four
|
BLD14-00949
| FIRE-Conference | 9/9/2014 | 9/9/2014 | 9/9/2014 4:41:43 PM | P | DONE |
|
|
Regarding inspection schedule and project related permit work
|
FIR14-00633
| INSP-Sprinkler Rough-in | 9/9/2014 | 9/9/2014 | 9/9/2014 4:40:52 PM | P | PART |
|
|
Fire sprinkler work approved for cover.
|
FIR11-00263
| FIR-Aging Inspection | 9/9/2014 | 9/9/2014 | 9/9/2014 1:17:11 PM | | PEND |
|
|
Refer to inspection notes 12/12/11 for correction items.
|
FIR11-00500
| FIR-Aging Inspection | 9/9/2014 | 9/9/2014 | 9/9/2014 12:49:37 PM | | DONE |
|
|
|
FIR14-00261
| INSP-Sprinkler Rough-in | 9/9/2014 | 9/9/2014 | 9/9/2014 12:44:54 PM | A | PART |
|
|
Need to provide a plan modification for resubmittal due to field changes in pipe routing, coverage at the stairways and landings prior to permit final.
|
BLD14-02402
| FIRE-Final Inspection | 9/9/2014 | 9/9/2014 | 9/9/2014 12:40:59 PM | A | NR |
|
|
Pending correction items per activity notes.
|
BLD14-01907
| FIRE-Final Inspection | 9/9/2014 | 9/9/2014 | 9/9/2014 12:40:02 PM | A | PASS |
|
|
Fire life safety passed.
|
FIR14-00527
| INSP-Sprinkler Rough-in | 9/8/2014 | 9/9/2014 | 9/9/2014 12:39:40 PM | A | PART |
|
|
Verified additional upright coverage at the womens restroom and south hall. Pendents at the open area sheetrock ceiling as marked and dated on stamped plans approved for cover.
|
FIR13-00167
| INSP-Sprinkler Rough-in | 9/8/2014 | 9/9/2014 | 9/9/2014 11:32:05 AM | P | CANC |
|
|
This is an ug to cover. John is the contact. Thanks Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
|