Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC14-00860 Site Preparation9/9/20149/9/20149/10/2014 11:56:42 AMPCANC
inspection conducted on 9/10
ESC14-00381 General Inspection9/9/20149/9/20149/9/2014 4:24:37 PM PASS
No dust issues or sediment leaving staging area or access road. Will need to have J & H Development reinstall check dams before the wet season on Windsong.
ESC14-00778 Complaint Inspection9/9/20149/9/20149/9/2014 3:54:29 PMPFAIL
complaint about sediment trackout and neighborhood disturbance...

Permit are posted for 3 adjacent "skinny homes" but there is backfill from the foundation process that needs to be swept off sidewalk and street.

Verbal correction notice issued to Hard Rock construction.
ESC14-00080 Aging Inspection9/9/20149/9/20149/9/2014 3:45:25 PM PASS
Home demolition is complete and construction materials have been removed. Lots has vegetated naturally with weeds and grasses. No ESC corrections required. Permit finaled.
ESC14-00080 DOC - Permit Finaled9/9/20149/9/20149/9/2014 3:43:31 PMPPASS
ESC14-00392 General Inspection9/9/20149/9/20149/9/2014 3:12:16 PM PASS
Old parking lot near east airport exit drive has been removed and is being prepped for grading and repaving. No signficant trackout or dust issues. Work area surrounds the old tower demolition project as well. Perimeter wattles installed sheet flow drainage points.

No corrections required at this time.
ESC14-00206 General Inspection9/9/20149/9/20149/9/2014 3:05:17 PM PART
No trackout or sediment runoff. Using large trench machine to dig into lava bedrock.

Need to provide water truck to keep down dust during the trenching/rock grinding operation.
ESC14-00450 Site Final9/5/20149/9/20149/9/2014 2:28:06 PMPPASS
Work at Idaho Power station yard is complete. No trackout or ESC issues at site. Permit finaled.
ESC14-00450 DOC - Permit Finaled9/9/20149/9/20149/9/2014 2:27:20 PMPPASS
ESC13-00755 Tracking Control9/9/20149/9/20149/9/2014 2:05:19 PMPPASS
Perimeter streets around Terraces project have been swept as requested last week. Syman Company also maintained silt sacks in storm drains. No new trackout or ESC issues observed. Corrections complete
ESC13-01279 General Inspection9/9/20149/9/20149/9/2014 2:03:21 PM PASS
Lucky Harris 13 in progress of installing sewer and utilities. Site has been in good condition since the previous trackout and sediment issues on Eckart and Arrow Junction was address. No new corrections at this time.
ESC13-01040 General Inspection9/9/20149/9/20149/9/2014 1:31:40 PM PASS
Home is complete and BLD permit has been finalied. Yard is on hillside and needs stabilization/landscaping to meet ESC permit conditions. No sediment runoff or other violations; will keep open until stabilization.
ESC13-01092 DOC - Permit Finaled9/9/20149/9/20149/9/2014 1:11:05 PMPPASS
Home is complete and landscaped. Currently for sale. No ESC corrections required. Permit finaled. Work on going by CBH in Pebble Creek. No violations observed.
ESC13-01094 Aging Inspection9/9/20149/9/20149/9/2014 1:08:54 PM PASS
Home is complete. Hole in One street has been swept. Site is landscaped/stabilized. Permit conditions satisfied.
ESC13-01094 DOC - Permit Finaled9/9/20149/9/20149/9/2014 1:07:48 PMPPASS
ESC14-00086 Random Inspection9/9/20149/9/20149/9/2014 12:51:22 PMPPASS
Work has resumed on Village Chaton. Access road and utilities have been installed, now working on the 4 fourplexes (covered under ESC14-00257 to -00260.

No violations observed; permit posted. No complaints received.
ESC13-00877 Aging Inspection9/9/20149/9/20149/9/2014 12:44:33 PM PASS
Permit finaled.
ESC13-00877 DOC - Permit Finaled9/9/20149/9/20149/9/2014 12:43:23 PMPPASS
Home is complete, yard is landscaped and stabilized. ESC permit conditions satisfied.
ESC14-00441 Site Final9/9/20149/9/20149/9/2014 12:34:51 PMPPART
No one is one site. If you would like to meet you there please call 30 minutes before. Phone #: ###-#### >> Inspection requested via web by Eldon Oyadomari

Work is complete and lot has been cleaned of construction materials.

Correction:
1. Sweep gutter in front of lot, significant accumulation. (may be due to residents accessing the open lot...)

Verbal notice given Idaho Power contact Eldon.

Eldon returned call. Crew will sweep up. Will check back this Friday for completion.
ESC13-01265 General Inspection9/5/20149/9/20149/9/2014 12:07:36 PMPPASS
High school building project is in pregress with limited activity occuring at time of inspection. No sediment trackout or runoff. Trash is contained. Permit posted. Approved
ESC14-00210 General Inspection9/9/20149/9/20149/9/2014 11:27:37 AM PASS
WIP. Office building is near completion. No corrections.
ESC14-00413 Site Preparation9/8/20149/9/20149/9/2014 9:44:58 AMAPASS
Grant Phone #: ###-####


RP onsite. Permit posted. Low risk; main BMP will be daily housekeeping and waste management. Approved.
ESC14-00414 Site Preparation9/8/20149/9/20149/9/2014 9:44:39 AMAPASS
Grant Phone #: ###-####

RP onsite. Permit posted. Low risk; main BMP will be daily housekeeping and waste management. Approved.
ESC13-01225 DOC - Permit Finaled9/9/20149/9/20149/9/2014 9:27:22 AMPPASS
ESC13-01225 Site Final9/8/20149/9/20149/9/2014 9:27:00 AMAPASS
Blair Phone #: ###-####

Outback Steakhouse is complete. Storm drain protection has been removed. Construction activity complete and site is clean and landscaped/stabilized. Permit conditions satisfied.
ESC13-00955 Aging Inspection9/9/20149/9/20149/9/2014 9:26:33 AM PASS
ESC14-00666 Site Preparation9/8/20149/9/20149/9/2014 9:12:25 AMAPASS
John Phone #: ###-####


Met GC for Boise Building Co. John at site. Infill in over 55 community. No surface water next to site. Main BMP will be daily cleanup. Concrete washout provided on adjacent lot. Approved for construction.
ESC14-00667 Site Preparation9/8/20149/9/20149/9/2014 9:12:04 AMAPASS
John Phone #: ###-####

Met GC for Boise Building Co. John at site. Infill in over 55 community. No surface water next to site. Main BMP will be daily cleanup. Concrete washout provided on adjacent lot. Approved for construction.
ESC13-00952 Aging Inspection9/9/20149/9/20149/9/2014 8:56:36 AM PASS
Permit is posted, BLD is still active. No activity or exterior disturbance at site. No corrections necessary.
ESC14-00387 General Inspection9/9/20149/9/20149/9/2014 8:52:16 AM PASS
BLD permit is still active. No acitivity or exterior disturbance at site. Permit posted on garage. No violations.
ESC14-00386 General Inspection9/9/20149/9/20149/9/2014 8:52:15 AM PASS
ESC14-00385 General Inspection9/9/20149/9/20149/9/2014 8:28:29 AM PASS