Inspections for the day of: Wednesday, September 25, 2019.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Storey
TitleBLD-COM/RES INSPECTOR
Phone #794-9490
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD18-04435 BLD-Foundation9/24/20199/25/20199/25/2019 3:51:08 PMPDEFR
1pm please- Brian Phone #: ###-#### placed with si .
MIS19-00313 BLD-Conference9/25/20199/25/20199/25/2019 3:49:34 PMPDEFR
BLD19-00877 Issued
Permit for a roof replacement work to include: Removing existing failing roof structure and replace with P.E. roof trusses. All work per plans, notations, attachments, truss engineering, local codes & ordinances. Seperate electrical and mechanical permits. **MDH**
BLD19-02168 BLD-Conference9/25/20199/25/20199/25/2019 3:48:45 PMPCANC
on stairwells Phone #: ###-####
BLD19-00264 BLD-Footing9/25/20199/25/20199/25/2019 3:36:48 PMPPART
Anne Phone #: ###-#### rebar ok 4 locations/ vert at one ok to place wall.
MIS19-00315 BLD-Conference9/25/20199/25/20199/25/2019 3:35:47 PMPFAIL
BLD17-03818 Expired
(TAG)(SUITE 10) (TWO PERMITS FILED UNDER BLD17-03806 IN EPLANREVIEW) PLAN MOD TO ADD EXTERIOR ENGINEERED AWNING, SEE SPECIAL INSPECTION FORM**AJS6-12-18**Tenant improvement project on the below grade level of an existing office building. Remove and add walls to update and alter two tenant spaces. Demolition and construction to occur in two different phases, one for each tenant space. See engineering for repairs in this space. This building is NOT fire sprinklered. **ajs**

BLD17-03910 Issued
(BASEMENT DEMO) ****NO NEW CONSTRUCTION ALLOWED UNDER THIS PERMIT**** This permit is to perform demo work only. Scope of work includes removal of non-bearing interior partition walls, removal of existing plumbing, removal of interior finishes, removal of all existing outlets and wiring back to the box or properly terminated above ceiling line, and removal of some existing light fixtures. All building sprinkler, alarm, and smoke evacuation systems must be maintained throughout the demo and after demo is completed. ****NO NEW CONSTRUCTION ALLOWED UNDER THIS
left notice to obtaine occ.
BLD19-02578 BLD-Wall Bracing9/25/20199/25/20199/25/2019 2:11:13 PMPPASS
Phone #: ###-#### Inspection requested via web by bryan murdoch
BLD19-02032 BLD-Wall Bracing9/25/20199/25/20199/25/2019 2:10:55 PMPPASS
Phone #: ###-#### Inspection requested via web by bryan murdoch
BLD19-02035 BLD-Energy code compliance9/25/20199/25/20199/25/2019 2:10:33 PMPPASS
Phone #: ###-#### Inspection requested via web by bryan murdoch
BLD19-01885 BLD-Framing/Rough-in9/24/20199/25/20199/25/2019 11:25:24 AMAPART
Phone #: ###-#### Inspection requested via web by Ron Goff need to resolve mech permit and insp. talked w/jack working on this now. /
BLD19-00101 BLD-Framing/Rough-in9/25/20199/25/20199/25/2019 11:24:11 AMAPASS
2nd floor and lobby
BLD19-01109 BLD-Framing/Rough-in9/24/20199/25/20199/25/2019 11:23:57 AMAPASS
1st floor cover up and second floor partial, drywall progression. Phone #: ###-#### Inspection requested via web by leonard loewen
BLD19-00314 BLD-Conference9/24/20199/25/20199/25/2019 10:06:14 AMAPASS
Exterior fire barrier inspection on building. Phone #: ###-#### Inspection requested via web by chad stradley gyp and screws ok
MIS18-00445 MIS-Aging Inspection9/25/20199/25/20199/25/2019 9:32:08 AM DONE
MIS18-00445 DOC - Permit Finaled9/25/20199/25/20199/25/2019 9:31:56 AMPPASS
BLD19-03598 BLD-Footing9/24/20199/25/20199/25/2019 9:29:31 AMAPASS
Pat Phone #: ###-####