ELE19-04228
| Electrical Rough-In | 2/18/2020 | 2/18/2020 | 2/18/2020 3:51:33 PM | P | PASS |
|
|
Mark Phone #: ###-#### Phase 1 level 2 hardlids rough in ok cover
|
ELE20-00447
| Electrical Rough-In | 2/18/2020 | 2/18/2020 | 2/18/2020 2:19:16 PM | P | PASS |
|
|
Cabinetry and Reception Desk Phone #: ###-#### Inspection requested via web by Winters LLC Nature center located behind existing fish and game building. Areas noted rough in ok cover.
|
ELE19-02808
| Electrical Rough-In | 2/17/2020 | 2/18/2020 | 2/18/2020 1:38:28 PM | P | PASS |
|
|
Kitchen ceiling Phone #: ###-#### Inspection requested via web by Jeremy Cloud Main kitchen area grid only rough in ok cover.
|
ELE20-00417
| Temporary Service | 2/14/2020 | 2/18/2020 | 2/18/2020 12:34:53 PM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Alan Lusk I installed main bonding screw that had worked its way out and was in bottom of panel. t/s u/g n ok
|
ELE20-00418
| Temporary Service | 2/14/2020 | 2/18/2020 | 2/18/2020 12:29:26 PM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Alan Lusk t/s u/g n ok
|
ELE20-00458
| Rough-In Permanent Service | 2/14/2020 | 2/18/2020 | 2/18/2020 12:26:23 PM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Alan Lusk BCC 4-05-23- It shall be unlawful for any person to cover in any way electrical wiring prior to an electrical inspection. Multiple warnings have been given. 110.14- All strands of a conductor shall terminate under pressure point of connection. Grounding electrode conductor. 334.12- NM cable shall not be stapled on edge. Garage front light and in utility room.
|
ELE20-00569
| Temporary Service | 2/17/2020 | 2/18/2020 | 2/18/2020 11:37:05 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Therrin Robertson t/s u/g n ok
|
ELE20-00568
| Temporary Service | 2/17/2020 | 2/18/2020 | 2/18/2020 11:31:17 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Therrin Robertson t/s u/g n ok
|
ELE20-00567
| Temporary Service | 2/17/2020 | 2/18/2020 | 2/18/2020 11:29:05 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Therrin Robertson t/s u/g n ok
|
ELE20-00566
| Temporary Service | 2/17/2020 | 2/18/2020 | 2/18/2020 11:28:39 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Therrin Robertson 110.12(B)- Internal parts of equipment including busbars, wiring terminals, insulators, and other surfaces shall not be damaged. Interior plastic bracket supporting busbars and over current devices broke and most mounting points.
|
ELE19-04738
| Final | 2/17/2020 | 2/18/2020 | 2/18/2020 10:46:15 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Therrin Robertson Final ok
|
ELE19-04737
| Final | 2/17/2020 | 2/18/2020 | 2/18/2020 10:42:07 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Therrin Robertson 110.22- Each disconnecting means shall be identified as to its purpose. Label furnace disconnect. 314.25- All boxes shall have covers. Garage door opener receptacle.
|
ELE19-04799
| Electrical Rough-In | 2/17/2020 | 2/18/2020 | 2/18/2020 9:45:18 AM | A | PASS |
|
|
elevated concrete deck Phone #: ###-#### Inspection requested via web by Jason Parke Pour proceeded prior to inspection due to prior inspection covered large portion of pour. We are OK on this pour and will be seeing all furture areas prior. Above grid line D rough in ok cover.
|
ELE20-00573
| Electrical Rough-In | 2/18/2020 | 2/18/2020 | 2/18/2020 8:12:49 AM | A | CANC |
|
|
Phone #: ###-#### >> Inspection requested via web by Mark M Inspection cancelled from web by: Mark M
|