Inspections for the day of: Friday, July 10, 2020.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRock A. Hudson
TitleELE-INSPECTOR
Phone #794-6794
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE20-02312 Electrical Rough-In7/10/20207/10/20207/10/2020 2:58:06 PMPPASS
Basement west wall has conduits with wiring out of conduit. All must be removed or terminate in a box as per 300.15. 6 circuits provided for show window receptacles Main level only rough in ok cover
ELE20-02226 Rough-In Permanent Service7/10/20207/10/20207/10/2020 2:31:46 PMPPASS
Phone #: ###-#### Inspection requested via web by Alan Lusk Attic HVAC trimmed at rough in. Rough in ok cover p/s u/g n ok
ELE20-02364 Final7/9/20207/10/20207/10/2020 12:31:47 PMANH
Patrick Rohm is the electrician to contact with questions. Phone #: ###-#### Inspection requested via web by A.M.E. Office No answer at door, contactor unable to reach owner for access. Will recall.
ELE19-04918 Final7/9/20207/10/20207/10/2020 11:33:09 AMAPART
South tower 12 units Phone #: ###-#### Inspection requested via web by Todd Hall 101, 102 DW not hooked up, House circuits not complete. Rest of units only south tower TCO ok.
ELE20-00912 Electrical Rough-In7/9/20207/10/20207/10/2020 10:23:36 AMAPASS
Phone #: ###-#### Inspection requested via web by Barbara Szurgot Master bath floor heat rough in ok cover.
ELE19-03829 Electrical Rough-In7/9/20207/10/20207/10/2020 10:06:00 AMAPASS
Wall rough-in inspection for the 5th floor.
Contact Shawn Evins
Thank you, Phone #: ###-#### Inspection requested via web by Cathy Duchek Level 5 core walls as noted on contractor print rough in ok cover.
ELE20-02363 Electrical Rough-In7/9/20207/10/20207/10/2020 9:42:24 AMAPASS
Cover inspection for new framing in tenant space Phone #: ###-#### Inspection requested via web by Steve Craig City approved set of prints on site confirmed. Walls and platforms rough in ok cover.