Inspections for the day of: Friday, January 17, 2020.
Number of inspections: 16
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJames Ady
TitleELE-INSPECTOR
Phone #914-4683
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE19-04228 Electrical Rough-In1/17/20201/17/20201/17/2020 2:15:50 PMPPASS
Mark Phone #: ###-#### as marked on print walls only ok to cover
ELE20-00141 Electrical Rough-In1/16/20201/17/20201/17/2020 1:31:55 PMPPASS
Owner will be working at BSU and has requested to be called when inspector is on his way using phone number provided. Phone #: ###-#### Inspection requested via web by Kelsey Timmons 4 garage receps, 2 on the RT and 2 on the LT. towards front of garage ok to cover
ELE19-04367 Final1/17/20201/17/20201/17/2020 12:39:31 PMPPASS
Phone #: ###-#### Inspection requested via web by PAUL PINNEY final ok
ELE17-04093 ELE-Aging Inspection1/17/20201/17/20201/17/2020 12:35:07 PM FAIL
No final scheduled at this time. No corrections made
ELE19-02181 Final1/16/20201/17/20201/17/2020 12:24:50 PMPPASS
Inspect - Dining room,....

I will be there.
Thank you,
Lonnie Phone #: ###-#### Inspection requested via web by Lonnie Sorichta final ok
ELE19-04805 Permanent Service1/16/20201/17/20201/17/2020 11:15:59 AMACANC
Phone #: ###-#### Inspection requested via web by A.M.E. Office
ELE19-04805 Electrical Rough-In1/16/20201/17/20201/17/2020 11:15:51 AMACANC
Phone #: ###-#### Inspection requested via web by A.M.E. Office
ELE19-04805 Final1/17/20201/17/20201/17/2020 11:15:38 AMPPASS
Phone #: ###-#### Inspection requested via web by A.M.E. Office Temp recep final ok
ELE20-00195 Electrical Rough-In1/17/20201/17/20201/17/2020 11:15:07 AMPCANC
Phone #: ###-#### Inspection requested via web by A.M.E. Office
ELE20-00195 Rough-In Permanent Service1/17/20201/17/20201/17/2020 11:14:54 AMPPASS
Phone #: ###-#### Inspection requested via web by A.M.E. Office Wood shop roughh in ok p/s o/h n ok
ELE20-00189 Electrical Rough-In1/16/20201/17/20201/17/2020 10:32:07 AMAPASS
Homeowner should be home , if not side door and garage door unlocked Phone #: ###-#### Inspection requested via web by Jesse Fuentes Garage, Sun room ok to cover
ELE20-00064 Electrical Rough-In1/17/20201/17/20201/17/2020 10:24:14 AMAPASS
between 8:00 and 10:00 if possible, subpanel rough-in inspection, Bob ###-#### Phone #: ###-#### Inspection requested via web by Dale Johnson Panel wall in back mud room/ laundry room only. All other additions will be cut in or surface mount
ELE19-04143 Final1/16/20201/17/20201/17/2020 10:11:51 AMAPASS
Garage code 1957E Phone #: ###-#### Inspection requested via web by Alan Lusk Final ok
ELE19-03998 Final1/16/20201/17/20201/17/2020 9:38:47 AMAPASS
The number is for Leni the homeowner - please call 30 minutes prior to arrival.
Thank you Phone #: ###-#### Inspection requested via web by Winters LLC Corrections made final ok
ELE20-00178 Conference1/16/20201/17/20201/17/2020 9:27:27 AMAPASS
Please call a minimum of 30 minutes in advance so contractor can meet inspector at the property Phone #: ###-#### Inspection requested via web by Kyle Dillon Wiring Sauna. Discussed using exhisting 6-3 pre-wired for hot tub to feed 6 circuit panel. 2 pole 35A for heater, remaining circuits to be used for general Lighting and receps. No Gfci required for receps inside sauna entry. GFCI protection may be required for heater per manufacturer specs. will need to provide ground rod.
ELE19-04892 Final1/16/20201/17/20201/17/2020 9:06:26 AMAPASS
Install 2 wall signs reading SCREEN. All Primary Power by others. Phone #: ###-#### Inspection requested via web by Ken Olsen sign only final ok