Inspections for the day of: Friday, December 13, 2019.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJames Ady
TitleELE-INSPECTOR
Phone #914-4683
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE19-04228 Electrical Rough-In12/13/201912/13/201912/13/2019 1:54:37 PMPPASS
for cover - Chadrick Phone #: ###-#### Vender meeting room and TV walls as marked on print.. ok to cover
ELE19-04786 Electrical Rough-In12/13/201912/13/201912/13/2019 12:53:07 PMPPASS
Rough-in inspection for floor heat. Phone #: ###-#### Inspection requested via web by Kevin Perez Master floor heat only ok to cover
ELE19-04596 Final12/13/201912/13/201912/13/2019 12:37:47 PMPPASS
Please contact Bryce (Foreman) @ ###-#### or Barry (Electrician) @ ###-#### one hr prior or if you have any questions. Thank you. Inspection requested via web by Rob Maes final ok
ELE19-04711 Final12/12/201912/13/201912/13/2019 12:09:30 PMPNR
workers on-site, garage code 2332, moved switches master bath, added 4 led waffers master bed Phone #: ###-#### Inspection requested via web by Dale Johnson
ELE19-04711 Electrical Rough-In12/13/201912/13/201912/13/2019 12:09:12 PMPPASS
workers on-site, garage code 2332, moved switches master bath, added 4 led waffers master bed Phone #: ###-#### Inspection requested via web by Dale Johnson Rough in only Need plates installed on switches in master bath for final.
ELE19-03827 Electrical Rough-In12/13/201912/13/201912/13/2019 11:12:01 AMPPASS
Call for access- Nick Phone #: ###-#### Whole house rewire rough in ok (Smart home system. Home will need programed before final. All required lighting shall be opperable. Key pads/Smart switches at Entry doors shall have outside and inside lights programed to them or provide timer program for exterior lighting.)
ELE19-03379 Final12/13/201912/13/201912/13/2019 10:54:12 AMAPASS
Homeowner should be home all morning. Phone #: ###-#### Inspection requested via web by Shaun Kirkman Final ok
ELE19-04690 Final12/12/201912/13/201912/13/2019 10:17:14 AMAPASS
Thomas Lansing Mechanical Installer ###-####
Phil Lansing, Home Owner ###-####
Please Let Me Know and I Will be On site with Mechanical Installer for Final.
Jon Hoene Electrician HD ELECTRIC LLC ###-#### Phone #: ###-#### Inspection requested via web by Jon G. Hoene FInal ok
ELE19-04690 Electrical Rough-In12/13/201912/13/201912/13/2019 10:16:56 AMAPASS
Thomas Lansing Mechanical Installer ###-####
Phil Lansing, Home Owner ###-####
Please Let Me Know and I Will be On site with Mechanical Installer for Final.
Jon Hoene Electrician HD ELECTRIC LLC ###-#### Phone #: ###-#### Inspection requested via web by Jon G. Hoene Listing only ok
ELE19-04781 Electrical Rough-In12/13/201912/13/201912/13/2019 9:53:25 AMAPASS
Please give me half an hour notice before inspection to insure access. Thank you Shaun ###-#### Phone #: ###-#### Inspection requested via web by Shaun Kirkman Up main bath, Down Bed only ok to cover
ELE19-04771 Final12/12/201912/13/201912/13/2019 9:10:29 AMAPASS
hot tub back yard Phone #: ###-#### Inspection requested via web by Dan Rohl Final ok
ELE19-04771 Electrical Rough-In12/13/201912/13/201912/13/2019 9:10:21 AMAPASS
hot tub back yard Phone #: ###-#### Inspection requested via web by Dan Rohl Hot tub rough in ok
ELE19-03855 Final12/12/201912/13/201912/13/2019 8:57:52 AMAPASS
Bill Phone #: ###-#### Low Volt com. cables. Final ok
ELE17-03994 Final12/12/201912/13/201912/13/2019 8:57:03 AMAPASS
This was a ground works inspection and should have been a final after ground works was inspected and passed
Any questions please call Eric at the number listed Phone #: ###-#### Inspection requested via web by Eric Schroeder Project finished under ELE-18-00192