ELE19-01403
| Electrical Rough-In | 12/2/2019 | 12/2/2019 | 12/2/2019 2:33:39 PM | P | PASS |
|
|
Rough in in slab boxes and raceway for pour L2 -5. Call John ###-#### Phone #: ###-#### Inspection requested via web by John Mittleider Area listed ok to cover
|
ELE19-04228
| Conference | 12/2/2019 | 12/2/2019 | 12/2/2019 2:32:56 PM | P | PASS |
|
|
Contact is Chad Sandoval Phone #: ###-#### Inspection requested via web by Scott Campbell Discussed work allowed under early start permit. Electrical install allowed, if changes are required upon final plan review, changes will be made and will require additional inspections. Top out of walls to a height of 10ft ok to allow for duct work to bel installed. NO ONE SIDING will be allowed. Inspections are required as Per BCC.
|
ELE19-04628
| Electrical Rough-In | 12/2/2019 | 12/2/2019 | 12/2/2019 1:18:45 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Terry Scott Kitchen only ok to cover
|
ELE19-03420
| Final | 12/2/2019 | 12/2/2019 | 12/2/2019 12:23:30 PM | P | PASS |
|
|
Jose Phone #: ###-#### Final ok
|
ELE18-03914
| Final | 12/2/2019 | 12/2/2019 | 12/2/2019 10:20:28 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Eric Landberg Final ok
|
ELE19-04500
| Temporary Service | 12/1/2019 | 12/2/2019 | 12/2/2019 9:58:09 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by kevin blackmon t/s u/g n ok
|
ELE19-04617
| Permanent Service | 11/27/2019 | 12/2/2019 | 12/2/2019 8:57:30 AM | A | PASS |
|
|
this is for the new service part Phone #: ###-#### Inspection requested via web by Richard Gratiot Spoke to contractor, Grounds have been seperated in inside panel. Will need to check at rough in or final. p/s u/g n ok
|
ELE19-04382
| Final | 11/27/2019 | 12/2/2019 | 12/2/2019 8:00:12 AM | A | CANC |
|
|
Phone #: ###-#### >> Inspection requested via web by Louis Keller Inspection cancelled from web by: Louis Keller
|