Inspections for the day of: Friday, February 28, 2020.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJames Ady
TitleELE-INSPECTOR
Phone #914-4683
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE19-00847 Final2/28/20202/28/20202/28/2020 2:04:05 PMPPART
Final inspection for Building #11. Thank you Phone #: ###-#### Inspection requested via web by Stuart Welton Exterior lights had not been installed. Contractor was hanging them and will have them up before end of day. partial final only
ELE19-04228 Electrical Rough-In2/28/20202/28/20202/28/2020 1:18:30 PMPPASS
Mark Phone #: ###-#### Drop ceiling only as marked on contractor print
ELE20-00230 Electrical Rough-In2/28/20202/28/20202/28/2020 12:33:31 PMPPASS
Zach on site. Phone #: ###-#### Inspection requested via web by Garrett Collins Shower wall and E and W entry walls ok to cover
ELE20-00504 Rough-In Permanent Service2/27/20202/28/20202/28/2020 12:16:40 PMPPASS
Phone #: ###-#### Inspection requested via web by Troy Ballard COrrections made rough in ok p/s u/g n ok
ELE20-00508 Rough-In Permanent Service2/27/20202/28/20202/28/2020 10:58:00 AMAFAIL
Phone #: ###-#### Inspection requested via web by Troy Ballard 210.52H All hallways 10ft or longer shall have at least 1 recep.(Master hall) 314.17 NM cable shall terminate in box.(X-mas recep above meter)
ELE20-00699 Electrical Rough-In2/27/20202/28/20202/28/2020 10:20:57 AMAPASS
Sir if nobody''s at the house please give me a call I''ll give you the code for the lock Box. Thank you. Phone #: ###-#### Inspection requested via web by David Kubik Complete rewire ok to cover.
ELE20-00695 Electrical Rough-In2/27/20202/28/20202/28/2020 8:43:05 AMANH
Phone #: ###-#### Inspection requested via web by David Nelson Nobody onsite. Doors locked.
ELE17-04313 ELE-Aging Inspection2/28/20202/28/20202/28/2020 7:59:56 AM FAIL
No inspections have been done. Lights are installed in concrete steps.