ELE20-00178
| Final | 3/1/2020 | 3/3/2020 | 3/3/2020 2:11:34 PM | P | CANC |
|
|
Please call ahead Phone #: ###-#### Inspection requested via web by Kyle Dillon
|
ELE20-00077
| Final | 3/3/2020 | 3/3/2020 | 3/3/2020 2:04:09 PM | P | PASS |
|
|
Leo Phone #: ###-#### final ok
|
ELE20-00505
| Rough-In Permanent Service | 3/3/2020 | 3/3/2020 | 3/3/2020 1:55:31 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Troy Ballard Corrections made rough in ok p/s u/g n ok
|
ELE20-00748
| Temporary Service | 3/3/2020 | 3/3/2020 | 3/3/2020 1:36:11 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Jim Williams t/s u/g n ok
|
ELE20-00624
| Electrical Rough-In | 3/3/2020 | 3/3/2020 | 3/3/2020 12:58:14 PM | P | CANC |
|
|
Kitchen remo Phone #: ###-#### Inspection requested via web by Greg Idsinga
|
ELE19-04513
| Electrical Rough-In | 3/3/2020 | 3/3/2020 | 3/3/2020 12:34:37 PM | P | PASS |
|
|
3rd floor B area pour Phone #: ###-#### Inspection requested via web by Stephanie Huston 3rd floor area B slab ok to cover
|
ELE20-00624
| Electrical Rough-In | 3/3/2020 | 3/3/2020 | 3/3/2020 12:25:39 PM | P | PASS |
|
|
Kitchen remo Phone #: ###-#### Inspection requested via web by Greg Idsinga Kitchen, Garage ceiling and F.P wall ok to cover(Existing circuits used)
|
ELE20-00447
| Final | 3/2/2020 | 3/3/2020 | 3/3/2020 11:06:39 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Winters LLC Reception area only final ok
|
ELE20-00745
| Electrical Rough-In | 3/2/2020 | 3/3/2020 | 3/3/2020 10:56:05 AM | A | PASS |
|
|
Door should be unlocked nobody''s livin there right now. The bedroom is left of the main door when you walk in. any questions please give me a call thank you. Phone #: ###-#### Inspection requested via web by David Kubik Access will need to be provided for Jetted tub motor and recep at final. Master bed, bath and closet ok to cover
|
ELE19-04376
| Electrical Rough-In | 3/2/2020 | 3/3/2020 | 3/3/2020 10:42:03 AM | A | PASS |
|
|
Potting and equipotential Phone #: ###-#### Inspection requested via web by Kevin Koomler Pool and spa EQ bond and Potting ok to cover
|
ELE20-00505
| Electrical Rough-In | 3/2/2020 | 3/3/2020 | 3/3/2020 10:21:28 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Troy Ballard 314.17 NM cable shall not be secured within 1 1/4in from face of framing member. (Up bed light switch behind laundry room) Missed wire entry hall can.
|
ELE19-03515
| Final | 3/2/2020 | 3/3/2020 | 3/3/2020 9:57:28 AM | A | FAIL |
|
|
Please call Dakota @ ###-#### with any questions. Phone #: ###-#### Inspection requested via web by William Salts 406.12 All dwelling unit receps shall be tamper resistant. ( All Standard decora receps in kitchen)
|
ELE19-04228
| Electrical Rough-In | 3/2/2020 | 3/3/2020 | 3/3/2020 9:14:31 AM | A | PASS |
|
|
Chad Phone #: ###-#### 1st floor Mens and Ladies restrooms ok to cover. 2nd floor Bull pin soffits ok to cover.
|
ELE20-00732
| Conference | 3/2/2020 | 3/3/2020 | 3/3/2020 12:00:00 AM | A | CANC |
|
|
Lars Phone #: ###-####
|