ELE20-01145
| Conference | 4/7/2020 | 4/8/2020 | 4/8/2020 2:19:05 PM | P | DONE |
|
|
PLEASE CALL KYLE 1 hour prior CONSULTATION - maybe he can meet you there. Thank you. Phone #: ###-#### Inspection requested via web by Kyle Lott House was occupied at time of inspection. Informed contractor to repair only damaged area. could not require him to update existing wiring in home.
|
ELE20-01249
| Final | 4/8/2020 | 4/8/2020 | 4/8/2020 1:52:44 PM | P | FAIL |
|
|
Please call Dakota @ ###-#### with any questions Phone #: ###-#### Inspection requested via web by William Salts 225.31 Means shall be provided for all ungrounded conductors that supply a building or structure. 406.12 All receps in a dwelling unit shall be tamper resistant.
|
ELE20-00916
| Electrical Rough-In | 4/8/2020 | 4/8/2020 | 4/8/2020 1:10:53 PM | P | PASS |
|
|
approval to cover trench Phone #: ###-#### Inspection requested via web by Alan Lusk Underground to septic only ok to cover
|
ELE19-01688
| Electrical Rough-In | 4/8/2020 | 4/8/2020 | 4/8/2020 1:10:03 PM | P | PASS |
|
|
Jamie *cleared* Phone #: ###-#### Underground between Shipping and CUP along side tunnel ok to cover. UFER ok to cover
|
ELE19-02700
| Electrical Rough-In | 4/6/2020 | 4/8/2020 | 4/8/2020 11:38:09 AM | A | PASS |
|
|
Contact Brandon for sub-basement wall rough in from elevators to south end of basement. Phone #: ###-#### Inspection requested via web by Tom Betty Lightning protection, Basement walls, Penthouse walls ok to cover
|
ELE20-00732
| Conference | 4/7/2020 | 4/8/2020 | 4/8/2020 10:20:20 AM | A | DONE |
|
|
Phone #: 2085014055 >> Inspection requested via mobile web by Lars Discussed inspection process and matching Engeneered prints to field install. When to call for inspections
|
ELE20-00200
| Final | 4/7/2020 | 4/8/2020 | 4/8/2020 10:16:34 AM | A | FAIL |
|
|
garage code 4224 Phone #: ###-#### Inspection requested via web by Troy Ballard Garage 3way dead, Desk recep 2nd floor bottom of stairs dead. re-call
|
ELE20-01079
| Rough-In Permanent Service | 4/7/2020 | 4/8/2020 | 4/8/2020 9:01:24 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Rodney Monroe rough in ok p/s u/g n ok
|
ELE20-01198
| Final | 4/7/2020 | 4/8/2020 | 4/8/2020 8:43:12 AM | A | PASS |
|
|
Please call if you have any questions Phone #: ###-#### Inspection requested via web by Thomas wilson final ok
|
ELE20-01105
| Electrical Rough-In | 4/7/2020 | 4/8/2020 | 4/8/2020 8:39:12 AM | A | PASS |
|
|
underground to light poles Phone #: ###-#### Inspection requested via web by John Rourke East end parking lot ok to cover
|
ELE20-01067
| Electrical Rough-In | 4/7/2020 | 4/8/2020 | 4/7/2020 5:27:43 PM | P | CANC |
|
|
There will be guys there from 8:30-9:30ish if a video chat can be done at that time. Please call Tony ###-####. Otherwise call our office and we will have to make different arrangements. Thanks!! Phone #: ###-#### >> Inspection requested via web by Clayton Morgan Inspection cancelled from web by: Clayton Morgan
|