ELE20-00919
| Final | 5/12/2020 | 5/12/2020 | 5/12/2020 1:23:40 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Patrick Clark corrections made final ok
|
ELE20-01610
| Conference | 5/12/2020 | 5/12/2020 | 5/12/2020 12:49:42 PM | P | DONE |
|
|
virtual inspection requested // Chuck Phone #: ###-#### Discussed wire size, GFCI protection, Tamper resistant receps, When to call for rough in.
|
ELE20-01586
| Permanent Service | 5/8/2020 | 5/12/2020 | 5/12/2020 12:29:37 PM | P | CANC |
|
|
Corbin Metcalf ###-#### Phone #: ###-#### >> Inspection requested via web by Samatha Solberg Inspection cancelled from web by: Samatha Solberg
|
ELE20-01145
| Electrical Rough-In | 5/12/2020 | 5/12/2020 | 5/12/2020 12:21:37 PM | P | PASS |
|
|
Lock in box # 7777. Re-energize inspection AND rough-in inspection please. Thank you!. Have a bless day! Phone #: ###-#### Inspection requested via web by Kyle Lott Front bedroom only ok to cover (House is occupied.)
|
ELE20-00320
| Final | 5/12/2020 | 5/12/2020 | 5/12/2020 12:10:50 PM | P | PASS |
|
|
Reinspect service clearance for final Phone #: ###-#### Inspection requested via web by Robert Schroder (Fencing was removed at time of inspection) Corrections made Final ok
|
ELE20-01145
| Permanent Service | 5/12/2020 | 5/12/2020 | 5/12/2020 11:31:03 AM | P | PASS |
|
|
Lock in box # 7777. Re-energize inspection AND rough-in inspection please. Thank you!. Have a bless day! Phone #: ###-#### Inspection requested via web by Kyle Lott Power was cut due to fire. No work done to service. Grounding is up to date and is existing. p/s o/h rec ok
|
ELE20-00919
| Final | 5/11/2020 | 5/12/2020 | 5/12/2020 10:58:48 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Patrick Clark 406.12(1) All areas listed in 210.52 shall be type Tamper resistant receps. (210.52G Attached and detached garages) 406.9A All receps in damp or wet location shall be type Weather Resistant (WR)
|
ELE19-04505
| Electrical Rough-In | 5/11/2020 | 5/12/2020 | 5/12/2020 10:34:53 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Jeremy Cloud Entry hard lid only ok to cover
|
ELE19-04701
| Final | 5/11/2020 | 5/12/2020 | 5/12/2020 10:34:19 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Heath Thomas Final ok
|
ELE20-01541
| Rough-In Permanent Service | 5/11/2020 | 5/12/2020 | 5/12/2020 9:59:54 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Alan Lusk rough in ok p/s u/g n ok
|
ELE20-01618
| Electrical Rough-In | 5/11/2020 | 5/12/2020 | 5/12/2020 9:35:51 AM | A | PASS |
|
|
Inspect underground conduit Phone #: ###-#### Inspection requested via web by Ryan Schaffer Underground from service to Disconnect and from disconnect to tub ok to cover
|
ELE19-04228
| Final | 5/11/2020 | 5/12/2020 | 5/12/2020 8:57:14 AM | A | PART |
|
|
part final- Mark **screened** Phone #: ###-#### 2nd floor TCO only Areas A and B
|