ELE20-01245
| Electrical Rough-In | 4/8/2020 | 4/8/2020 | 4/8/2020 2:05:01 PM | P | PASS |
|
|
UFER ground inspection for main service in Parking Garage. Call Lonny with any questions, ###-####. Thanks Phone #: ###-#### Inspection requested via web by Lonny Baum Ok cover Ufer
|
ELE19-04455
| Electrical Rough-In | 4/8/2020 | 4/8/2020 | 4/8/2020 1:11:56 PM | P | PASS |
|
|
Floor heat Phone #: ###-#### Inspection requested via web by Jim Williams Ok cover floor heat main and mstr
|
ELE19-03145
| Electrical Rough-In | 4/8/2020 | 4/8/2020 | 4/8/2020 12:11:45 PM | P | PASS |
|
|
1st ; 2nd floor units hallway soffits. Phone #: ###-#### Inspection requested via web by Kevin Burke Ok cover hallway lights in 1st and 2nd floor due to fur down for HVAC.
|
ELE20-01228
| Rough-In Permanent Service | 4/8/2020 | 4/8/2020 | 4/8/2020 11:55:39 AM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Alan Lusk Ok cover. p/s u/g n ok
|
ELE20-01183
| Electrical Rough-In | 4/7/2020 | 4/8/2020 | 4/8/2020 11:14:04 AM | A | PASS |
|
|
Taylor Barton is the onsite contact Phone #: ###-#### Inspection requested via web by BRS Permitting UL listing confirmed
|
ELE20-00875
| Final | 4/7/2020 | 4/8/2020 | 4/8/2020 10:35:44 AM | A | FAIL |
|
|
Please enter trough the back door. Phone #: ###-#### Inspection requested via web by Nermin Bobaric Service will need to be upgraded due to split buss panel breakers are sharing loads, not enough space left to provide each circuit with its own breaker. Can do 2 ground rods at far end of house as all patio area is concrete with a pool, dont know if any electrical is under concrete.
|
ELE20-01143
| Permanent Service | 4/7/2020 | 4/8/2020 | 4/8/2020 10:32:54 AM | A | PASS |
|
|
We are asking for a service energize so we can have the power turned back on in the afternoon then we will have you back for a final on the rest, thank you call me if you need to be let in before 9:00, I can be there in 15 min.. thank you. Phone #: ###-#### Inspection requested via web by Rick Beckman p/s u/g rec ok
|
ELE20-00615
| Electrical Rough-In | 4/7/2020 | 4/8/2020 | 4/8/2020 9:55:03 AM | A | PASS |
|
|
floor heat in master bathroom and main bathroom Phone #: ###-#### Inspection requested via web by Bonnie Page Ok cover floor heat main and mstr.
|
ELE20-01219
| Permanent Service | 4/7/2020 | 4/8/2020 | 4/8/2020 9:26:28 AM | A | PASS |
|
|
This is a permanent service re-inspection for the well only. Phone #: ###-#### Inspection requested via web by Paula Gratiot p/s u/g n ok
|