Inspections for the day of: Wednesday, April 8, 2020.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMark Moncarr
TitleELE-INSPECTOR
Phone #685-9023
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE20-01245 Electrical Rough-In4/8/20204/8/20204/8/2020 2:05:01 PMPPASS
UFER ground inspection for main service in Parking Garage. Call Lonny with any questions, ###-####. Thanks Phone #: ###-#### Inspection requested via web by Lonny Baum Ok cover Ufer
ELE19-04455 Electrical Rough-In4/8/20204/8/20204/8/2020 1:11:56 PMPPASS
Floor heat Phone #: ###-#### Inspection requested via web by Jim Williams Ok cover floor heat main and mstr
ELE19-03145 Electrical Rough-In4/8/20204/8/20204/8/2020 12:11:45 PMPPASS
1st ; 2nd floor units hallway soffits. Phone #: ###-#### Inspection requested via web by Kevin Burke Ok cover hallway lights in 1st and 2nd floor due to fur down for HVAC.
ELE20-01228 Rough-In Permanent Service4/8/20204/8/20204/8/2020 11:55:39 AMPPASS
Phone #: ###-#### Inspection requested via web by Alan Lusk Ok cover. p/s u/g n ok
ELE20-01183 Electrical Rough-In4/7/20204/8/20204/8/2020 11:14:04 AMAPASS
Taylor Barton is the onsite contact Phone #: ###-#### Inspection requested via web by BRS Permitting UL listing confirmed
ELE20-00875 Final4/7/20204/8/20204/8/2020 10:35:44 AMAFAIL
Please enter trough the back door. Phone #: ###-#### Inspection requested via web by Nermin Bobaric Service will need to be upgraded due to split buss panel breakers are sharing loads, not enough space left to provide each circuit with its own breaker. Can do 2 ground rods at far end of house as all patio area is concrete with a pool, dont know if any electrical is under concrete.
ELE20-01143 Permanent Service4/7/20204/8/20204/8/2020 10:32:54 AMAPASS
We are asking for a service energize so we can have the power turned back on in the afternoon then we will have you back for a final on the rest, thank you call me if you need to be let in before 9:00, I can be there in 15 min.. thank you. Phone #: ###-#### Inspection requested via web by Rick Beckman p/s u/g rec ok
ELE20-00615 Electrical Rough-In4/7/20204/8/20204/8/2020 9:55:03 AMAPASS
floor heat in master bathroom and main bathroom Phone #: ###-#### Inspection requested via web by Bonnie Page Ok cover floor heat main and mstr.
ELE20-01219 Permanent Service4/7/20204/8/20204/8/2020 9:26:28 AMAPASS
This is a permanent service re-inspection for the well only. Phone #: ###-#### Inspection requested via web by Paula Gratiot p/s u/g n ok