Inspections for the day of: Friday, March 13, 2020.
Number of inspections: 16
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTom Saunders
TitleELE-INSPECTOR
Phone #208-794-1923
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE16-00910 ELE-Aging Inspection3/13/20203/13/20203/13/2020 3:05:19 PM FAIL
homeowner been notified
ELE17-01002 ELE-Aging Inspection3/13/20203/13/20203/13/2020 3:04:40 PM DONE
still under construction
ELE20-00886 Electrical Rough-In3/12/20203/13/20203/13/2020 3:03:55 PMPCANC
Please call 30 mins prior as electrician is not on site Phone #: ###-#### Inspection requested via web by Kerri Hamilton...needed conference...wiring not yet complete
ELE20-00886 Conference3/13/20203/13/20203/13/2020 3:03:19 PMPPASS
Please call 30 mins prior as electrician is not on site Phone #: ###-#### Inspection requested via web by Kerri Hamilton...discussed wiring of house...specific layout and SD requirement-hard wire or not-building permit requirement
ELE19-03639 Electrical Rough-In3/13/20203/13/20203/13/2020 1:58:38 PMPPASS
rough in for metal furred down ceiling areas in breezeways at ends of breezeways. Phone #: ###-#### Inspection requested via web by Todd Hall...ok to cover
ELE20-00668 Final3/13/20203/13/20203/13/2020 1:17:14 PMPFAIL
Contact Julian Lopez (General Contractor) for access. Phone #: ###-#### Inspection requested via web by Scott Campbell...
1) receptacles shall be firmly fastened to wall
2) all receptacles and switches shall have platesinstalled
3) work shall be completed before scheduling final inspections
ELE20-00809 Electrical Rough-In3/13/20203/13/20203/13/2020 12:23:07 PMPPASS
Underground Inspection Phone #: ###-#### Inspection requested via web by Steven Ragan...
ok to cover...pipe for RV pedestal
ELE20-00897 Permanent Service3/13/20203/13/20203/13/2020 12:03:18 PMPPASS
Call ahead 15 mins- Lance Phone #: ###-####...
THIS PERMIT NEEDS REFUNDED...ELE20-00869 is permit inspections done under...pulled twice because unsure what needed to do by homeowner
ELE20-00869 Permanent Service3/13/20203/13/20203/13/2020 11:55:04 AMPPASS
meter replaced...1st one had issues...2nd replacement....
p/s u/g reconnect ok
ELE19-04381 Final3/12/20203/13/20203/13/2020 11:14:49 AMAPASS
call me on way so i can meet to let you in. Phone #: ###-#### Inspection requested via web by Kurtis Moore...ok to final
ELE20-00449 Electrical Rough-In3/12/20203/13/20203/13/2020 10:16:19 AMAPASS
Phone #: ###-#### Inspection requested via web by Kerri Hamilton...remaining walls of phase 1 ok to cover...plans marked
ELE19-04918 Electrical Rough-In3/12/20203/13/20203/13/2020 9:45:05 AMAPASS
South tower 12 units
ceiling drops Phone #: ###-#### Inspection requested via web by Todd Hall...ok to cover
ELE20-00481 Final3/13/20203/13/20203/13/2020 9:16:51 AMAPASS
Phone #: ###-#### Inspection requested via web by Bayley Beard..few corrections made...outside canopy complete-disconnect and surface wiring for lights...ok to final
ELE19-04125 Final3/12/20203/13/20203/13/2020 8:48:46 AMAPASS
Code for door is 2020 Phone #: ###-#### Inspection requested via web by David Kubik...
corrections made...ok to final
MIS20-00041 Set Bond Amount2/28/20203/13/20203/13/2020 7:40:02 AMACANC
check for permits...given more than 30 days...wrong inspection
ELE20-00869 Final3/12/20203/13/20203/13/2020 7:30:16 AMAPASS
Lance Phone #: ###-####...finaled previous day