Inspections for the day of: Wednesday, April 29, 2020.
Number of inspections: 16
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTom Saunders
TitleELE-INSPECTOR
Phone #208-794-1923
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE20-01473 Conference4/29/20204/29/20204/29/2020 2:48:35 PMPPASS
Screened- video- detached garage Joseph&Alaina Phone #: ###-####...
discussed wiring of auxillary building...requirements and inspections...pamphlet given
ELE20-01453 Final4/29/20204/29/20204/29/2020 1:37:14 PMPPASS
Idaho Power cannot disconnect until 11 a.m..if you could see me after 3 that would be great
Thanks Phone #: ###-#### Inspection requested via web by Eddy Udry...
riser replaced...grounding updated...complete...ok to final
ELE20-01453 Permanent Service4/27/20204/29/20204/29/2020 1:36:09 PMPPASS
Idaho Power cannot disconnect until 11 a.m..if you could see me after 3 that would be great
Thanks Phone #: ###-#### Inspection requested via web by Eddy Udry...
p/s o/h reconnect ok
ELE20-00695 Final4/28/20204/29/20204/29/2020 1:25:09 PMAPASS
access 1027 Phone #: ###-#### Inspection requested via web by David Nelson...corrections made...ok to final
ELE20-01383 Final4/29/20204/29/20204/29/2020 1:14:05 PMPPASS
Screened- Ronald Phone #: ###-####...
riser replaced...job complete..ok to final
ELE20-01383 Permanent Service4/29/20204/29/20204/29/2020 1:13:38 PMPPASS
Screened- Ronald Phone #: ###-####...
p/s reconnect ok
ELE20-00750 Electrical Rough-In4/29/20204/29/20204/29/2020 11:57:29 AMPPASS
ceiling drops Phone #: ###-#### Inspection requested via web by Todd Hall...corrected..ok to cover
ELE20-01383 Conference4/29/20204/29/20204/29/2020 11:24:30 AMAPASS
service...raising riser for access to backyard...discussed job over phone...going to change to 2" rigid and raise only 30" above roof ...homeowner seems competent
ELE19-03639 Electrical Rough-In4/28/20204/29/20204/29/2020 11:00:59 AMAPASS
first floor drops and heat tape locations in breezeways Phone #: ###-#### Inspection requested via web by Todd Hall...above locations ok to cover
ELE19-03961 Electrical Rough-In4/28/20204/29/20204/29/2020 10:55:59 AMAPASS
2nd floor units (all if possible, or let me know) Phone #: ###-#### Inspection requested via web by Todd Hall...ok to cover units and breezeways up to heat tape areas...all floors
ELE20-00750 Electrical Rough-In4/28/20204/29/20204/29/2020 9:59:03 AMAFAIL
ceiling drops bldg 10 Phone #: ###-#### Inspection requested via web by Todd Hall....
1) NMB/Romex shall be strapped and supported by staples or approved means...334.30
2)NMB/romex shall be protected a minimum 1/4" from face of material...taping to T channel not acceptable means
ELE19-04924 Electrical Rough-In4/28/20204/29/20204/29/2020 8:46:44 AMAPASS
Wall rough in Phase 5. Phone #: ###-#### Inspection requested via web by David Feller...
walls ok to cover...8 outlets and switching for new rm...storage rm for material of next phases
ELE19-02894 Electrical Rough-In4/29/20204/29/20204/29/2020 7:47:54 AMAPASS
rough inspection...inspection done by emailed images as per COVID19 requirements...conference had been given and discussed requirements of wiring of areas...ok to cover
ELE19-04173 Electrical Rough-In4/28/20204/29/20204/29/2020 12:00:00 AMAFAIL
ceiling drops bldg 10 Phone #: ###-#### Inspection requested via web by Todd Hall....
1) NMB/Romex shall be strapped and supported by staples or approved means...334.30
2)NMB/romex shall be protected a minimum 1/4" from face of material...taping to T channel not acceptable means
ELE19-04173 Electrical Rough-In4/29/20204/29/20204/29/2020 12:00:00 AMAPASS
ceiling drops Phone #: ###-#### Inspection requested via web by Todd Hall...corrected..ok to cover
ELE19-02894 Electrical Rough-In4/28/20204/29/20204/28/2020 12:31:24 PMPCANC
ok with video/photo // larry Phone #: ###-####...check for email to review rough