ELE19-01489
| Final | 4/6/2020 | 4/6/2020 | 4/6/2020 2:43:52 PM | P | NR |
|
|
Kitchen/Misc final. Jesse is the contact. Phone #: ###-#### Inspection requested via web by Buster Bowen... no electrician on site...walked with general kitchen not complete...GFCI protection all 120V outlets...freezer disconnect for inside cooler...kitchen panel needs labelling completion electrical rm open junction box...access to panels exterior lighting missing 5 cans GYM storage rm complete need to do rooftop units...need electrician onsite
|
ELE19-03639
| Electrical Rough-In | 4/6/2020 | 4/6/2020 | 4/6/2020 1:27:38 PM | P | PASS |
|
|
building B 3rd floor ceiling drops 12 units Phone #: ###-#### Inspection requested via web by Todd Hall...ok to cover...stated areas
|
ELE20-01088
| Electrical Rough-In | 4/6/2020 | 4/6/2020 | 4/6/2020 12:54:07 PM | P | PASS |
|
|
Treon 208 972 2383 Phone #: ###-#### Inspection requested via web by Scott Campbell..
wall cover for breakroom walls N & S offices and conferences all marked and initialed on print
|
ELE20-00034
| Final | 4/6/2020 | 4/6/2020 | 4/6/2020 11:34:01 AM | P | PASS |
|
|
Taylor Baron will be the one site contact (###-####) Phone #: ###-#### Inspection requested via web by BRS Permitting...labelling, disconnect, and OCPD..ok
|
ELE20-00034
| Electrical Rough-In | 4/3/2020 | 4/6/2020 | 4/6/2020 11:33:28 AM | P | PASS |
|
|
Taylor Baron will be the one site contact (###-####) Phone #: ###-#### Inspection requested via web by BRS Permitting...UL listings verified
|
ELE20-00896
| Electrical Rough-In | 4/6/2020 | 4/6/2020 | 4/6/2020 10:33:54 AM | P | PASS |
|
|
Ufer Ground Inspection near electrical room. Phone #: ###-#### Inspection requested via web by Debby Pierce...ok to cover...bare stranded
|
ELE20-01082
| Rough-In Permanent Service | 4/6/2020 | 4/6/2020 | 4/6/2020 10:17:57 AM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Rodney Monroe... 1) Boise City ordinance...house shall not be foam sealed or caulked until all required inspections are done material will be removed before electrical inspection done 2) required access for inspection required...exterior meter masked off for painting
|
ELE19-03074
| Conference | 4/6/2020 | 4/6/2020 | 4/6/2020 9:52:00 AM | A | PASS |
|
|
discussed wiring of gas insert, outlet above mantel, outlets within 6ft of fireplace-walls where open and able, and will take pics og heated floor in 2nd bath-has done mst bath and been inspected already
|
ELE19-04918
| Electrical Rough-In | 4/6/2020 | 4/6/2020 | 4/6/2020 9:00:53 AM | A | NR |
|
|
underground for carports, pole lights and irrigation pump. Please inspect late morning if possible Phone #: ###-#### Inspection requested via web by Todd Hall...not ready...contractor called...excavator behind
|
ELE17-03756
| Final | 4/2/2020 | 4/6/2020 | 4/6/2020 8:54:33 AM | A | FAIL |
|
|
Justin Metcalf ###-#### The panel outside. Permission to walk through the gate. Phone #: ###-#### Inspection requested via web by Samatha Solberg....
1) every circuit and circuit modification shall be legibly identified as to its clear, evident, and specific purpose or use...408.4 2) PVC shall be strapped..300 3) LB cover needs installed correctly..110.3 4) Boise City ordinance...no code violation shall be retained...work done out of scope but also done without permits need addressed at service
|