FIR14-00783
| INSP-Sprinkler Rough-in | 1/22/2015 | 1/22/2015 | 1/22/2015 4:22:16 PM | P | PART |
|
|
|
FIR14-00252
| INSP-Sprinkler Rough-in | 1/21/2015 | 1/22/2015 | 1/22/2015 4:17:07 PM | P | PART |
|
|
Preliminary inspection for the 3rd floor parking garage level completed. Dry pendents at the hard lid ceiling south side central okayed for cover.
|
BLD14-02816
| FIRE-Final Inspection | 1/21/2015 | 1/22/2015 | 1/22/2015 2:04:23 PM | A | PASS |
|
|
Life safety inspection passed provided a fire extinguisher is posted as discussed- To be completed prior to structural final. Note: signature card not available on site at the time of inspection.
|
FIR14-00781
| INSP-Final Inspection | 1/19/2015 | 1/22/2015 | 1/22/2015 1:00:45 PM | A | DEFR |
|
|
Final Inspection for Panel Change Out and Phone Line Monitoring Phone #: ###-#### Inspection requested via web by Jeremy Berg
|
FIR14-00252
| INSP-Sprinkler Rough-in | 1/21/2015 | 1/22/2015 | 1/21/2015 3:59:33 PM | P | CANC |
|
|
This an OH/RTC inspection. Mike S is your contact. Please call 1/2 hour prior to inspection. Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
|