FIR14-00261
| INSP-Sprinkler Rough-in | 11/12/2014 | 11/12/2014 | 11/13/2014 1:31:50 PM | P | PART |
|
|
OH fire sprinkler work at three restrooms 1st floor south okay for cover. Coverage at soffit SE corner also approved for cover.
|
FIR14-00668
| INSP-Conference | 11/12/2014 | 11/12/2014 | 11/13/2014 1:29:02 PM | P | DONE |
|
|
Regarding inspection notes, freeze protection at the breezeway, coverage adjustments, and tenting.
|
FIR14-00743
| INSP-Sprinkler Rough-in | 11/11/2014 | 11/12/2014 | 11/13/2014 1:26:00 PM | P | PART |
|
|
Refer to stamped plans for areas okay to cover. Noted two locations in need of additional coverage due to obstruction and overspacing. Need to provide walls to the deck or a drop ceiling at the storage room to maintain adequate protection.
|
FIR14-00711
| INSP-Sprinkler Rough-in | 11/11/2014 | 11/12/2014 | 11/12/2014 2:59:51 PM | P | PART |
|
|
Rough-in inspection passed
|
FIR14-00053
| INSP-Final Inspection | 11/5/2014 | 11/12/2014 | 11/12/2014 12:50:11 PM | A | PASS |
|
|
Scope of fire alarm work completed and passed site inspection and testing. Verified signals received.
|
FIR14-00638
| INSP-Sprinkler Rough-in | 11/10/2014 | 11/12/2014 | 11/12/2014 12:47:02 PM | A | PART |
|
|
UG fire supply line from the point of connection to the ductile riser completed. *NOTE- contractor has installed retainer in place of thrust blocking at the 90.
|
FIR14-00675
| INSP-Sprinkler Rough-in | 11/11/2014 | 11/12/2014 | 11/12/2014 12:42:49 PM | A | PART |
|
|
Rough-in at the tenant remodel area okayed, verified added coverage opposite the new demising wall.
|
FIR14-00675
| INSP-Sprinkler Rough-in/Hydro | 11/10/2014 | 11/12/2014 | 11/12/2014 10:15:33 AM | A | PART |
|
|
Overhead fire sprinkler work at the grid ceiling areas okayed for cover- ref. dated annotations on plans.
|
BLD14-01649
| FIRE-Final Inspection | 11/11/2014 | 11/12/2014 | 11/12/2014 9:28:22 AM | A | PASS |
|
|
Fire life safety inspection completed and passed.
|
FIR14-00583
| INSP-Final Inspection | 11/12/2014 | 11/12/2014 | 11/12/2014 9:22:56 AM | A | PASS |
|
|
Fire sprinkler permit work approved for final.
|
BLD14-02300
| FIRE-Final Inspection | 11/10/2014 | 11/12/2014 | 11/12/2014 9:20:15 AM | A | PASS |
|
|
Life safety inspection passed provided approved style hardware is installed at the south exit door- removed keyed lock deadbolt at this location prior to structural final.
|