Inspections for the day of: Thursday, February 20, 2020.
Number of inspections: 21
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTony Young
TitleBLD-COM/RES INSPECTOR
Phone #794-9462
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD19-02587 BLD-Aging Inspection2/20/20202/20/20202/21/2020 9:52:12 AM PEND
BLD18-04248 BLD-Final2/19/20202/20/20202/21/2020 9:51:36 AMPPART
Larry Phone #: ###-####,, ok pending mechanical pass
BLD19-01828 BLD-Energy code compliance2/19/20202/20/20202/21/2020 9:50:21 AMPPART
3rd floor energy seal inspection. Phone #: ###-#### Inspection requested via web by Michael Zaccheo,, work in progress,, ok to insulate
BLD19-01828 BLD-Other2/19/20202/20/20202/21/2020 9:49:38 AMPPART
Periodic drywall install inspection 1st ; 2nd floors. Phone #: ###-#### Inspection requested via web by Michael Zaccheo,, work in progress,, ok
BLD19-02992 BLD-Final2/19/20202/20/20202/20/2020 2:14:07 PMPDONE
Phone number provided is for the onsite contact; BRS technician, Mierens Rozental. Phone #: ###-#### Inspection requested via web by BRS Permitting
BLD19-02992 DOC - Permit Finaled2/20/20202/20/20202/20/2020 2:13:55 PMPPASS
done
BLD19-04287 BLD-Conference2/20/20202/20/20202/20/2020 2:03:34 PMPPASS
Krista; Phone #: ###-####// recieved letter from SITE ( Bob Arnold) engineering of approval of soils testing
BLD19-02217 BLD-Foundation2/19/20202/20/20202/20/2020 2:00:38 PMPPART
Jack Phone #: ###-####.. work in progress on basement footings on new area
BLD18-03168 BLD-Aging Inspection2/20/20202/20/20202/20/2020 1:59:20 PM DONE
BLD18-03168 DOC - Permit Finaled2/20/20202/20/20202/20/2020 1:58:03 PMPPASS
BLD19-01828 BLD-Wall cover2/19/20202/20/20202/20/2020 1:55:46 PMAPART
Two layer drywall install inspection 2nd floor units. Phone #: ###-#### Inspection requested via web by Michael Zaccheo// work in progress
BLD19-03330 BLD-Energy code compliance2/19/20202/20/20202/20/2020 1:50:15 PMPNR
Dave Phone #: ###-####,,work in progress,, re-scheduled for Friday
BLD18-04507 BLD-Final2/19/20202/20/20202/20/2020 11:22:15 AMAPART
call ahead // PJ Phone #: ###-####/// ok after finishing the saftey glass covering within 24"of the doors
BLD18-04507 BLD-Blower Door Test Results2/19/20202/20/20202/20/2020 11:10:54 AMADONE
Call: PJ Smith on way to inspection. PJ Would like to walk through home with inspector, 208 559 0588

Have a great weekend!

PJ Phone #: ###-#### Inspection requested via web by PJ Smith/// 3.5
BLD19-01859 BLD-Final2/19/20202/20/20202/20/2020 10:57:34 AMAPASS
Creg Phone #: ###-####
BLD19-01859 DOC - Permit Finaled2/20/20202/20/20202/20/2020 10:57:26 AMPPASS
c of o issued
BLD19-01859 BLD-Blower Door Test Results2/20/20202/20/20202/20/2020 10:57:09 AMPDONE
Creg Phone #: ###-####/// 3.82
BLD19-03546 BLD-Framing/Rough-in2/19/20202/20/20202/20/2020 10:07:06 AMAPART
Dan Phone #: ###-#### Inspection requested via web by Daniel Appel// need to seal gap in the top of the chase next to outside wall on the west side/// ok to insulate
BLD19-02406 BLD-Energy code compliance2/20/20202/20/20202/20/2020 10:00:12 AMAPART
Partial Insulation inspection at Shear wall/Demising wall in interior Portion of building, For shear placement after passed inspection. Any questions please feel free to contact me at anytime.

Thank You. Phone #: ###-#### Inspection requested via web by Ron Oswald// south end ok
BLD19-02406 BLD-Framing/Rough-in2/20/20202/20/20202/20/2020 9:59:20 AMAPART
Partial Exterior rough Framing for Buildouts at building perimeter. Any questions please feel free to contact me at anytime. Thank You, Phone #: ###-#### Inspection requested via web by Ron Oswald// work in progress,, ok to cover as needed pending trades
BLD19-02406 BLD-Energy code compliance2/19/20202/20/20202/20/2020 7:21:00 AMPCANC
Partial at The shear wall demising Phone #: ###-#### >> Inspection requested via web by Ron Oswald Inspection cancelled from web by: Ron Oswald