MIS20-00115
| BLD-Conference | 4/15/2020 | 4/15/2020 | | P | |
|
|
|
BLD20-00881
| BLD-Framing/Rough-in | 4/15/2020 | 4/16/2020 | 4/16/2020 6:54:24 PM | A | PEND |
|
|
*screened* Fire caulking complete, caleb Phone #: ###-#### ok after elec rough in is signed off
|
BLD19-04952
| BLD-Framing/Rough-in | 4/16/2020 | 4/16/2020 | 4/16/2020 6:53:16 PM | P | PEND |
|
|
Tyler Phone #: ###-####
|
BLD18-03767
| BLD-Footing | 4/15/2020 | 4/16/2020 | 4/16/2020 6:52:58 PM | P | PART |
|
|
Rocky - Screened for COVID 19 symptoms Phone #: ###-####
|
BLD20-00359
| BLD-Footing | 4/15/2020 | 4/16/2020 | 4/16/2020 6:52:44 PM | P | NR |
|
|
Michael Phone #: ###-####
|
BLD18-03143
| BLD-Framing/Rough-in | 4/16/2020 | 4/16/2020 | 4/16/2020 1:05:34 PM | P | PASS |
|
|
2nd floor recheck of 2" tub drains in soffit framing. If possible, Level 5 Electrical Room at Mech Shaft. (Shaft wall assembly). Coordinate with Adam. Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD18-03143
| BLD-Energy code compliance | 4/15/2020 | 4/16/2020 | 4/16/2020 1:05:10 PM | A | PASS |
|
|
Ongoing cover inspections. List TBD at time of walk with Adam/ Mike. Call when heading to site. AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD19-04214
| BLD-Final | 4/14/2020 | 4/16/2020 | 4/16/2020 9:54:34 AM | A | PASS |
|
|
Screened- if possible call 30 mins- Shaun Phone #: ###-####
|
BLD19-04214
| DOC - Permit Finaled | 4/16/2020 | 4/16/2020 | 4/16/2020 9:54:24 AM | P | PASS |
|
|
|
BLD19-04809
| BLD-Ceiling Grid Inspection | 4/15/2020 | 4/16/2020 | 4/16/2020 9:10:29 AM | A | PASS |
|
|
screened // Mike Phone #: ###-####
|
BLD20-00411
| BLD-Wall cover | 4/15/2020 | 4/16/2020 | 4/16/2020 9:10:16 AM | A | PASS |
|
|
Phone #: 6198890305 >> Inspection requested via mobile web by Shawn
|
BLD19-04805
| BLD-Framing/Rough-in | 4/15/2020 | 4/16/2020 | 4/16/2020 9:10:02 AM | A | PASS |
|
|
Tom **Cleared** Phone #: ###-####
|
BLD19-04859
| DOC - Permit Finaled | 4/16/2020 | 4/16/2020 | 4/16/2020 7:03:54 AM | A | PASS |
|
|
|