Inspections for the day of: Thursday, April 16, 2020.
Number of inspections: 13
Percentage of inspections complete: 92 %
Percentage of inspections not complete: 8 %
Contact Information
InspectorDave Hannah
TitleBLD-COM/RES INSPECTOR
Phone #794-1967
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MIS20-00115 BLD-Conference4/15/20204/15/2020 P 
BLD20-00881 BLD-Framing/Rough-in4/15/20204/16/20204/16/2020 6:54:24 PMAPEND
*screened* Fire caulking complete, caleb Phone #: ###-#### ok after elec rough in is signed off
BLD19-04952 BLD-Framing/Rough-in4/16/20204/16/20204/16/2020 6:53:16 PMPPEND
Tyler Phone #: ###-####
BLD18-03767 BLD-Footing4/15/20204/16/20204/16/2020 6:52:58 PMPPART
Rocky - Screened for COVID 19 symptoms Phone #: ###-####
BLD20-00359 BLD-Footing4/15/20204/16/20204/16/2020 6:52:44 PMPNR
Michael Phone #: ###-####
BLD18-03143 BLD-Framing/Rough-in4/16/20204/16/20204/16/2020 1:05:34 PMPPASS
2nd floor recheck of 2" tub drains in soffit framing. If possible, Level 5 Electrical Room at Mech Shaft. (Shaft wall assembly). Coordinate with Adam. Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD18-03143 BLD-Energy code compliance4/15/20204/16/20204/16/2020 1:05:10 PMAPASS
Ongoing cover inspections. List TBD at time of walk with Adam/ Mike. Call when heading to site. AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD19-04214 BLD-Final4/14/20204/16/20204/16/2020 9:54:34 AMAPASS
Screened- if possible call 30 mins- Shaun Phone #: ###-####
BLD19-04214 DOC - Permit Finaled4/16/20204/16/20204/16/2020 9:54:24 AMPPASS
BLD19-04809 BLD-Ceiling Grid Inspection4/15/20204/16/20204/16/2020 9:10:29 AMAPASS
screened // Mike Phone #: ###-####
BLD20-00411 BLD-Wall cover4/15/20204/16/20204/16/2020 9:10:16 AMAPASS
Phone #: 6198890305 >> Inspection requested via mobile web by Shawn
BLD19-04805 BLD-Framing/Rough-in4/15/20204/16/20204/16/2020 9:10:02 AMAPASS
Tom **Cleared** Phone #: ###-####
BLD19-04859 DOC - Permit Finaled4/16/20204/16/20204/16/2020 7:03:54 AMAPASS