Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD20-01500 BLD-Framing/Rough-in7/1/20207/1/20207/6/2020 5:14:29 AMPPART
Jim Phone #: ###-#### windows ok but needs elec rough in before covering any walls with elec in them
BLD19-04317 BLD-Wall Bracing6/30/20207/1/20207/1/2020 5:49:08 PMPPASS
Jorge *screened* Phone #: ###-####
BLD19-04915 BLD-Foundation7/1/20207/1/20207/1/2020 2:00:26 PMPPEND
Please call before coming so I can meet you at gate 50 to be escorted into the job site. If you don''t know where gat 50 is, call me so I can you give directions Thanks! Phone #: ###-#### Inspection requested via web by Frank Loucks ok after spec inspection sign off
BLD18-03143 BLD-Framing/Rough-in7/1/20207/1/20207/1/2020 1:56:15 PMPPASS
7th Floor, fire stop at ceilings, 6th Street Side. Call adam when heading to site. Will provide garage access. Thanks. AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD19-00366 BLD-Framing/Rough-in6/30/20207/1/20207/1/2020 1:56:01 PMPPART
//Screened// Charlie - Call for access Phone #: ###-#### nw stair tower ok