Inspections for the day of: Wednesday, February 19, 2020.
Number of inspections: 5
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD19-04223 FIRE-Final Inspection2/19/20202/19/20202/19/2020 3:33:18 PMPFAIL
Provide annual inspection tag for the fire extinguisher and repair the exit sign. jesse Phone #: ###-####
FIR19-00792 INSP-Sprinkler Rough-in2/19/20202/19/20202/19/2020 2:31:31 PMPPART
Piping rough-in passed. As-buillts are needed showing the supply pipe routing change for the 4th floor. Piping can not be covered until a tenting inspection has been passed. The stand pipe was not inspected due to a relocation request.

Tanner Phone #: ###-####
BLD19-03333 FIRE-Conference2/18/20202/19/20202/19/2020 2:16:58 PMADONE
Conference was over the door hardware for the escape rooms. The hardware operation needs to meet Chapter 10 of the fire and building codes. It appears that sections 1010.1.9.8 and 1010.1.9.9 would be the applicable code sections. Also a fire alarm permit is required for the fire alarm interconnect required per the drawings and IFC section 1010.1.9.8. Also the project related fire sprinkler permit needs finaled.

Taylor Phone #: ###-####
BLD19-03209 FIRE-Final Inspection2/18/20202/19/20202/19/2020 9:11:40 AMAPART
Life safety for phase 1 and phase 2 is complete.

Tom Phone #: ###-####
FIR19-00827 INSP-Sprinkler Rough-in2/18/20202/19/20202/19/2020 9:09:21 AMAPASS
The phase 1 and phase 2 fire alarm installation is complete as marked on the plans. One hvac unit in phase 1 is still in need of repairs and verification that the duct smoke detector functions.

Needs to be done at 7:00am Phone #: ###-#### Inspection requested via web by Sam Ball