FIR19-00769
| INSP-Sprinkler Rough-in/Hydro | 4/22/2020 | 4/23/2020 | 4/23/2020 2:30:56 PM | P | PASS |
|
|
The rough-in passed for the piping mods. 200lb hydro test passed for the pipe mods.
Please give Jim Lewis a call to schedule the inspection time. ###-#### Phone #: ###-#### Inspection requested via web by Joshua Hansen
|
BLD20-00495
| FIRE-Final Inspection | 4/23/2020 | 4/23/2020 | 4/23/2020 2:29:42 PM | P | FAIL |
|
|
Provide sprinkler protection for the new room or remove ceiling as discussed, provide annual inspection tag for the fire extinguisher, remove the thumbturn deadbolt for the new room door, provide single action hardware on all interior doors as discussed. Screened-please call prior- 3 min away- Faith Phone #: ###-####
|
BLD20-00771
| FIRE-Final Inspection | 4/21/2020 | 4/23/2020 | 4/23/2020 11:49:22 AM | A | PASS |
|
|
Life safety passed.
Kyle Phone #: ###-####
|
FIR19-00783
| INSP-Sprinkler Rough-in | 4/22/2020 | 4/23/2020 | 4/23/2020 8:38:16 AM | A | CANC |
|
|
Cancel per point of contact. Tanner **Cleared** Phone #: ###-####
|
BLD20-00656
| FIRE-Final Inspection | 4/22/2020 | 4/23/2020 | 4/23/2020 8:11:32 AM | A | FAIL |
|
|
Need to have the project related fire sprinkler permit finaled. Need to repair/rewire the new exit sign as discussed.
Lloyd Phone #: ###-####
|