Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR14-00865 FIR-Aging Inspection8/6/20208/6/2020   
FIR14-00895 FIR-Aging Inspection8/6/20208/6/2020   
FIR15-00132 FIR-Aging Inspection8/6/20208/6/2020   
FIR13-00218 FIR-Aging Inspection8/7/20208/7/2020   
FIR14-00238 FIR-Aging Inspection8/7/20208/7/2020   
FIR14-00684 FIR-Aging Inspection8/10/20208/10/2020   
FIR19-00775 INSP-Final Inspection8/11/20208/11/20208/11/2020 3:28:17 PMPPASS
Permit finaled.

screened // Tanner Phone #: ###-####
FIR19-00792 INSP-Sprinkler Rough-in/Hydro8/10/20208/11/20208/11/2020 3:27:56 PMAPART
The standpipe, 1st and 2nd floor hydro tests witnessed. 3rd and 4th would not hold pressure.

Tanner - */Screened/* Phone #: ###-####
BLD18-03049 FIRE-Final Inspection8/11/20208/11/20208/11/2020 1:53:24 PMPPASS
Life safety passed. Racking permit finaled.
BLD19-02069 FIRE-Final Inspection8/10/20208/11/20208/11/2020 1:52:22 PMAPASS
life safety passed. Five single row racks shown on the plans located along the south wall have not been installed.> A separate permit will be required if these racks are installed.

Andy Lewcer Phone #: ###-#### Inspection requested via web by Jeff Higgins
FIR20-00317 INSP-Final Inspection8/11/20208/11/20208/11/2020 12:48:09 PMPPASS
Permit finaled
FIR20-00313 INSP-Final Inspection8/10/20208/11/20208/11/2020 12:47:46 PMPCANC
Gabe Garduno is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
BLD19-03923 FIRE-Final Inspection8/11/20208/11/20208/11/2020 11:01:45 AMPPASS
Life safety passed.

David on-site contact 830.0212 Phone #: ###-#### Inspection requested via web by Ron Ramza
FIR20-00317 INSP-Sprinkler Rough-in8/10/20208/11/20208/11/2020 10:53:47 AMAPASS
Rough-in passed.

Richard Clark is the contact. He would prefer this in the late AM. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
FIR20-00466 INSP-Sprinkler Rough-in8/11/20208/11/20208/11/2020 9:13:39 AMAPASS
The remaining underground supply piping is ok for cover.

Underground rough to cover at Suez connection point. Call Anthony before you head out. Thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
FIR20-00467 INSP-Sprinkler Rough-in8/11/20208/11/20208/11/2020 9:13:23 AMAPASS
The remaining underground supply piping is ok for cover.

Underground rough to cover at Suez connection point. Call Anthony before you head out. Thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
FIR20-00469 INSP-Sprinkler Rough-in8/11/20208/11/20208/11/2020 9:13:03 AMAPASS
The remaining underground supply piping is ok for cover.

Underground rough to cover at Suez connection point. Call Anthony before you head out. Thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
FIR20-00468 INSP-Sprinkler Rough-in8/11/20208/11/20208/11/2020 9:12:39 AMAPASS
The remaining underground supply piping is ok for cover.

Underground rough to cover at Suez connection point. Call Anthony before you head out. Thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
BLD19-03209 FIRE-Final Inspection8/10/20208/11/20208/11/2020 8:29:43 AMAFAIL
Inspection was for phase 3 and 4. Need the fire alarm addressed in these areas, Need exit signs and emergency lightys repaired.

Schedule with fire alarm at 7am. Thank you Phone #: ###-#### Inspection requested via web by tom mccalister
FIR19-00827 INSP-Final Inspection8/7/20208/11/20208/11/2020 8:28:39 AMAFAIL
As-builts needed showing the increase in candella in the two restrooms, The one and only duct smoke detector tested shut the unit down but did not report to the FACP. All duct smoke detectors will need to be tested. Notification is needed in the marked exit path through the east side office and the 30cd strobe needs to be located as per plans to provide coverage in the short corridor in front of the electrical room.

Need to sound bells at 7am prior to offices opening.

This is for phases 3 ; 4. Phone #: ###-#### Inspection requested via web by James Williams
BLD20-00670 FIRE-Final Inspection8/10/20208/11/20208/10/2020 3:29:03 PMACANC
Kitchen Remodel >> Inspection requested via web by David Thompson Inspection cancelled from web by: David Thompson
FIR14-00827 FIR-Aging Inspection8/11/20208/11/2020   
FIR15-00163 FIR-Aging Inspection8/11/20208/11/2020   
FIR15-00155 FIR-Aging Inspection8/11/20208/11/2020