BLD19-02621
| BLD-Framing/Rough-in | 3/25/2020 | 3/26/2020 | 3/26/2020 3:56:58 PM | P | DEFR |
|
|
please schedule for late afternoon. Thanks Phone #: ###-#### Inspection requested via web by bill gullickson. Due to employee on job site testing poitive for covid-19, inspection can not be performed at this time.
|
BLD19-03416
| BLD-Final | 3/26/2020 | 3/26/2020 | 3/26/2020 3:26:04 PM | P | DONE |
|
|
Phone #: ###-#### Inspection requested via web by Cindy Zickgraf
|
BLD19-03416
| DOC - Permit Finaled | 3/26/2020 | 3/26/2020 | 3/26/2020 3:25:54 PM | P | PASS |
|
|
All work appeared to be done in accordance with local codes and ordinaces.
|
BLD18-04243
| BLD-Ceiling Grid Inspection | 3/25/2020 | 3/26/2020 | 3/26/2020 3:00:16 PM | P | PASS |
|
|
2nd floor 3 west offices ceilings for cover Phone #: ###-#### Inspection requested via web by Jared Waggoner
|
BLD18-04369
| BLD-Ceiling Grid Inspection | 3/25/2020 | 3/26/2020 | 3/26/2020 3:00:02 PM | P | PASS |
|
|
2nd floor 3 west offices for ceiling cover Phone #: ###-#### Inspection requested via web by Jared Waggoner
|
BLD19-02564
| BLD-Foundation | 3/26/2020 | 3/26/2020 | 3/26/2020 2:37:08 PM | P | CANC |
|
|
wall // mike Phone #: ###-####
|
BLD19-02564
| BLD-Framing/Rough-in | 3/26/2020 | 3/26/2020 | 3/26/2020 2:37:01 PM | P | PART |
|
|
wall // mike Phone #: ###-####. Needs to remove screws from grid and provide kickers to structure. Ok to cover. will verfiy kickers install at final by removing ceiling grid. Also went over mag lock details with contractor.
|
GRD19-00093
| GRD-Other | 3/26/2020 | 3/26/2020 | 3/26/2020 1:57:29 PM | P | CANC |
|
|
rebar for retaining wall // angela Phone #: ###-####. rescheduled for tomorrow in the am.
|
BLD20-00501
| BLD-Foundation | 3/26/2020 | 3/26/2020 | 3/26/2020 1:27:13 PM | P | PASS |
|
|
wall // Bill Phone #: ###-####
|
BLD19-04836
| BLD-Framing/Rough-in | 3/25/2020 | 3/26/2020 | 3/26/2020 11:10:18 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Jeffery Thompson
|
BLD19-02619
| BLD-Wall Bracing | 3/25/2020 | 3/26/2020 | 3/26/2020 10:12:18 AM | A | PEND |
|
|
Phone #: ###-#### Inspection requested via web by bill gullickson. Needs to resolve with Tony.
|
BLD19-02617
| BLD-Wall Bracing | 3/25/2020 | 3/26/2020 | 3/26/2020 10:11:50 AM | A | PEND |
|
|
Phone #: ###-#### Inspection requested via web by bill gullickson. Needs to resolve with Tony.
|
BLD19-04734
| BLD-Framing/Rough-in | 3/25/2020 | 3/26/2020 | 3/26/2020 9:46:03 AM | A | NR |
|
|
Phone #: ###-#### Inspection requested via web by Chad Aland. Mech rough in inspection has failed.
|
BLD18-04520
| BLD-Energy code compliance | 3/25/2020 | 3/26/2020 | 3/26/2020 9:19:08 AM | A | PASS |
|
|
Insulation and RC inspection for cover in Building 11 -Tower 3 (North 12 units) Phone #: ###-#### Inspection requested via web by Bob Goodwin
|
BLD20-00216
| BLD-Other | 3/25/2020 | 3/26/2020 | 3/26/2020 9:01:00 AM | A | DONE |
|
|
Inspection on a completed asphalt re-roof project. Phone #: ###-#### Inspection requested via web by Michael La Pointe
|
BLD20-00216
| DOC - Permit Finaled | 3/26/2020 | 3/26/2020 | 3/26/2020 9:00:51 AM | P | PASS |
|
|
All work appeared to be done in accordance with local codes and ordinaces.
|
BLD20-00152
| BLD-Framing/Rough-in | 3/26/2020 | 3/26/2020 | 3/26/2020 8:49:17 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Joel Hirtle. Roll block floor joist at all interior bearing locations. Draft stop floor joist to divide area to less than 1,00s.f. Ok to insulate. Correction notice posted.
|
GRD19-00093
| GRD-Other | 3/23/2020 | 3/26/2020 | 3/26/2020 12:00:00 AM | A | CANC |
|
|
rebar // Angela Phone #: ###-####
|