NAF15-00008
| INSP-Final | 4/15/2015 | 4/16/2015 | 4/16/2015 2:37:21 PM | A | PASS |
|
|
Scope of work completed. Rough in and final inspections passed. Fire Sprinkler permit finaled.
|
NAF15-00008
| INSP-Alarm Testing | 4/15/2015 | 4/16/2015 | 4/16/2015 2:36:03 PM | A | CANC |
|
|
Permit number and inspection type does not match scope of work.
|
BLD14-03056
| FIRE-Final Inspection | 4/16/2015 | 4/16/2015 | 4/16/2015 1:23:24 PM | P | PASS |
|
|
Completed inspection 4/16 in conjunction with TI permit.
|
BLD15-00071
| FIRE-Final Inspection | 4/15/2015 | 4/16/2015 | 4/16/2015 1:21:41 PM | P | PASS |
|
|
Fire Lifesafety passed. Verified previous correction notice items completed satifactory.
|
FIR13-00167
| INSP-Sprinkler Rough-in | 4/15/2015 | 4/16/2015 | 4/16/2015 11:42:31 AM | P | NR |
|
|
Not ready for inspection per phone conversation from Contractor. Pending PIV location determination.
|
FIR14-00815
| INSP-Sprinkler Rough-in/Hydro | 4/15/2015 | 4/16/2015 | 4/16/2015 11:35:35 AM | A | PART |
|
|
2hr Hydrostatic pressure test on Dry system # 2 on the 4th floor completed ok. System #2 is the small system.
|
BLD15-00639
| FIRE-Final Inspection | 4/15/2015 | 4/16/2015 | 4/16/2015 11:09:10 AM | A | PASS |
|
|
Fire Life Safety finaled
|
BLD14-03326
| FIRE-Final Inspection | 4/15/2015 | 4/16/2015 | 4/16/2015 11:07:52 AM | A | PASS |
|
|
Fire Lifesafety Finaled
|
FIR15-00211
| INSP-Final Inspection | 4/15/2015 | 4/16/2015 | 4/16/2015 11:05:32 AM | A | PASS |
|
|
Scope of work completed, roughin and final inspection pass. Permit Finaled.
|
FIR14-00866
| INSP-Sprinkler Rough-in | 4/15/2015 | 4/16/2015 | 4/16/2015 10:20:07 AM | A | PART |
|
|
Tenting at 4th flr at south end completed with the exception of rm 431 (not completed) and the exterior wall in shower enclosure at rm 432. One area in room 430 adjusted on site.
|