Inspections for the day of: Friday, April 17, 2015.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorKatie Marron
TitleFIRE INSPECTOR
Phone #395-7809
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR14-00638 INSP-Sprinkler Rough-in4/16/20154/17/20154/17/2015 4:18:38 PMACANC
Wrong permit number requested for inspection. Inspection intended for overhead work not underground.
FIR14-00815 INSP-Sprinkler Rough-in4/16/20154/17/20154/17/2015 4:08:14 PMPPART
Part of dry system 1 rough in completed as marked on plans. Corrections items noted were missing head rm 400, missing hangar and head misaligned room 437, head misaligned rm 435 and remove comm cabling along hallway main. Verified draft stops per plan.
FIR15-00229 INSP-Sprinkler Rough-in4/17/20154/17/20154/17/2015 2:33:20 PMPPART
Ok to cover at new small officers per plan. Matched response heads to be provided throughout. Noted obstructed coverage at new breakroom, contractor to make adjustments to be verified at next inspection.
FIR14-00070 INSP-Supply line flush4/17/20154/17/20154/17/2015 2:31:40 PMPCANC
Cancelled by contractor.
FIR14-00071 INSP-Supply line flush4/17/20154/17/20154/17/2015 2:30:22 PMPPART
Underground flush completed satisfactory. Noted that there needs to be seisimic clearance between ductile riser and floor slab in bldg L.
BLD15-00537 FIRE-Final Inspection4/16/20154/17/20154/17/2015 11:44:25 AMAPASS
Life Safety Pass. All previous noted items complete satisfactory.
BLD14-03140 FIRE-Final Inspection4/16/20154/17/20154/17/2015 11:22:11 AMAPART
Fire Lifesafety pass for 2nd floor. Final pending finishes at first floor.
FIR15-00071 INSP-Final Inspection4/16/20154/17/20154/17/2015 11:20:55 AMAPASS
Scope of work completed. Final walk through completed, sprinkler pass. Sprinkler permit finaled.
FIR15-00069 INSP-Final Inspection4/16/20154/17/20154/17/2015 11:20:31 AMAPASS
Scope of work completed. Functional testing completed satisfactory, one device adjusted on site on first floor. Fire Alarm Permit Finaled.
FIR15-00170 INSP-Final Inspection4/16/20154/17/20154/17/2015 9:53:06 AMAPASS
Permit Finaled. Previously noticed items have been completed satisfactory. New drops in electrical closet and south east corner OK. Riser annual inspection due this month and scheduled for 4/17. No signature card on site.
BLD15-00009 FIRE-Final Inspection4/16/20154/17/20154/17/2015 9:31:02 AMAFAIL
Emergency exit/egress lighting not functional. Ceiling tiles to be replaced and electrical receptacles to be covered in new open tenant space.