FIR15-00096
| INSP-Sprinkler Rough-in | 6/30/2015 | 7/1/2015 | 7/1/2015 4:40:03 PM | P | PART |
|
|
Insulation (tenting) inspection for 5th floor units, including unit 501, 506, 536, 537, 533, 531, 540, 541, 542, 543, and 544. A few more units still need to be done before the entire 5th floor is completed.
|
FIR14-00875
| INSP-Alarm Testing | 6/30/2015 | 7/1/2015 | 7/1/2015 4:37:56 PM | A | PART |
|
|
Partial fire alarm test for the entire apartment building, including all fire sprinkler interface devices, including waterflows, tampers, etc., and then all fire alarm devices, including SDs, FSDs, MPs, elevator recall functions (Elevator # 1 only). More testing is required to complete the process, mostly on the upper floors. NOTE: Fire alarm installation work is still on-going in Towers 3 & 4, while they are looking for partial TCO for Towers 1 and possible 2. Therfore, this is just a partial test of the system that is completed today.
|
FIR14-00531
| INSP-Alarm Testing | 6/30/2015 | 7/1/2015 | 7/1/2015 4:33:39 PM | A | PART |
|
|
Fire alarm interface tested, including all wet pipe waterflows (all floors), tampers, etc., including the exterior bell. All systems tested OK. Final inspection to follow.
|
FIR14-00430
| INSP-Alarm Testing | 7/1/2015 | 7/1/2015 | 7/1/2015 4:31:48 PM | P | PART |
|
|
Fire alarm interface inspection of the 2 dry systems protecting the grade level parking garage, including flow testing, low air alarms, tampers, etc. The 24 hour air test started after all alarm features were tested. Complete air test will be conducted next day.
|
FIR13-00725
| INSP-Sprinkler Rough-in/Hydro | 7/1/2015 | 7/1/2015 | 7/1/2015 12:06:33 PM | P | PASS |
|
|
Hydrotest of two (2) dry pipe systems supplying upper standpipes located at stairs C2, A03, A03B, and A04. (200 psi @ 2hrs - PASSED).
|
FIR13-00167
| INSP-Sprinkler Rough-in/Hydro | 6/29/2015 | 7/1/2015 | 7/1/2015 12:03:38 PM | A | CANC |
|
|
Wrong permit called in for this inspection. See FIR13-00725 for inspections completed today (7/1).
|