Inspections for the day of: Thursday, August 13, 2015.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorThomas Walsh
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR14-00638 INSP-Sprinkler Rough-in/Hydro8/12/20158/13/20158/13/2015 4:06:46 PMACANC
Not ready for FS U/G test today - Will reschedule for tomorrow.
NOTE: This test will also hydrotest all of the standpipe risers in the building.
FIR13-00724 INSP-Alarm Testing8/12/20158/13/20158/13/2015 4:05:00 PMAPART
Fire alarm testing (continuation) for abaove grade SDs, FSD, HVAC shutdowns, rolldown doors (floors 4 & 5) elevator smoke guard doors,etc.
Checked monitoring for alarms received - OK. Also checked exterior bell for waterflow alarms - tested OK.
FIR14-00890 INSP-Final Inspection8/13/20158/13/20158/13/2015 12:55:44 PMPCANC
Talked to alarm contractor and told him that we cannot start fire alarm testing, until fire sprinkler systems (dry and wet) are ready for testing, which should be another day or so as hydrotesting and air testing of systems is currently being performed. If all the hydrotests and air test pass without problems, then the sprinklers can be made ready for flow testing, tampers, trip test of DP valves, etc.
FIR15-00096 INSP-Supply line flush8/12/20158/13/20158/13/2015 12:51:15 PMAPART
24 hour air tested started for all (four) dry=pipe valves. Will retest in 24 hours to ensure system is ait tight.
FIR15-00096 INSP-Sprinkler Rough-in8/12/20158/13/20158/13/2015 12:49:31 PMACANC
5th floor wet systems not ready for hydrotest. Canceled Appt.
FIR15-00096 INSP-Sprinkler Rough-in/Hydro8/12/20158/13/20158/13/2015 12:47:55 PMAPART
%th floor dry-pipe system hydrostatic test (North side). 200 psi @ 2hrs - PASSED
NOTE: South side DP system for 5th floor hydrotested this morning - also PASSED
FIR15-00096 INSP-Sprinkler Rough-in8/11/20158/13/20158/13/2015 11:54:07 AMPPART
Rough to cover inspection for the entire 5th floor corridors, including elevator lobbies.
OK to cover pipe in these areas.
Actually inspected on 8/12 TW
FIR15-00096 INSP-Sprinkler Rough-in/Hydro8/11/20158/13/20158/13/2015 10:37:12 AMPPART
Hydrostatic test of two (2) wet pipe systems for the fourth floor - 200 psi @ 2hrs - PASSED. Actually tested on 8/12 TW.
FIR14-00890 INSP-Final Inspection8/12/20158/13/20158/13/2015 6:56:47 AMACANC
As early as possible Phone #: 2089414511 >> Inspection requested via mobile web by Nathan Price Inspection cancelled via mobile web on Thursday, August 13, 2015.