BLD19-03785
| FIRE-Final Inspection | 3/19/2020 | 3/20/2020 | 3/20/2020 2:22:43 PM | P | PASS |
|
|
Fire sprinkler inspection is complete, fire alarm inspection is complete, fire extinguishers are in common areas with current inspection tags. Final life fire safety inspection for area of work complete, signature card no available at time of inspection.
Fire life safety inspection after final inspection on FIR19-00862 Phone #: ###-#### Inspection requested via web by Jerry Jones
|
FIR19-00675
| INSP-Final Inspection | 3/19/2020 | 3/20/2020 | 3/20/2020 2:21:28 PM | P | PASS |
|
|
Final fire sprinkler inspection for scope of work is complete.
Please Call Steve Johnson upon arrival to B26 for escort Phone #: ###-#### Inspection requested via web by Steve Johnson
|
FIR20-00016
| INSP-Sprinkler Rough-in/Hydro | 3/20/2020 | 3/20/2020 | 3/20/2020 2:20:42 PM | P | DONE |
|
|
Hydrostatic test witnessed for area of work, no pressure loss observed.
|
FIR19-00862
| INSP-Final Inspection | 3/19/2020 | 3/20/2020 | 3/20/2020 2:20:03 PM | P | PASS |
|
|
Final fire sprinkler inspection for scope of work is complete.
Please Call Steve Johnson when you arrive in B26 Lobby to escort to areas. Phone #: ###-#### Inspection requested via web by Steve Johnson
|
FIR20-00111
| INSP-Sprinkler Rough-in/Hydro | 3/19/2020 | 3/20/2020 | 3/20/2020 2:18:18 PM | P | PART |
|
|
City approved plans have been notated with green highlighter areas approved for cover.
Austin Farnworth is the contact. The inspection will be for the 1st floor. Thanks! (: Phone #: ###-#### Inspection requested via web by Stan Beus
|
BLD19-01250
| FIRE-Final Inspection | 3/20/2020 | 3/20/2020 | 3/20/2020 2:01:26 PM | P | PART |
|
|
Final life fire safety inspection for TCO phase 1 is complete.
|
BLD19-04670
| FIRE-Conference | 3/20/2020 | 3/20/2020 | 3/20/2020 1:18:34 PM | P | DONE |
|
|
Fire conference is complete, large HVAC unit is 4000CFM according to the HVAC contractor. HVAC untis that 2001CFM and higher requires smoke detection for HVAC unit shutdown with remote annunciator. A seperate FIR permit is required for smoke detector install.
Johnathon Phone #: ###-####
|
FIR20-00122
| INSP-Sprinkler Rough-in | 3/19/2020 | 3/20/2020 | 3/20/2020 12:18:09 PM | P | FAIL |
|
|
Open outlet above finish ceiling with no sprinkler drop, area was notated on city approved drawings. No tenting installed at time of inspection.
Johnathon Phone #: ###-####
|
FIR20-00109
| INSP-Sprinkler Rough-in | 3/19/2020 | 3/20/2020 | 3/20/2020 12:07:26 PM | P | PART |
|
|
Plans have been corrected. White sealant type compound has been applied to the electrical boxes, white sealant has come in contact with sprinkler piping section between level 1 and 2, need to have a letter submitted for compatability of sealant and CPVC or piping needs to be replaced. No tenting installed at time of inspection, cover is not approved.
Johnathon Phone #: ###-####
|
FIR20-00098
| INSP-Sprinkler Rough-in | 3/19/2020 | 3/20/2020 | 3/20/2020 12:04:29 PM | P | FAIL |
|
|
City approved drawings has been notated with red ink where a sprinkler head was not installed. No tenting install at time of inspection.
Johnathon Phone #: ###-####
|
FIR20-00178
| INSP-Final Inspection | 3/20/2020 | 3/20/2020 | 3/20/2020 9:42:53 AM | A | CANC |
|
|
|
FIR20-00178
| INSP-Final Inspection | 3/20/2020 | 3/20/2020 | 3/20/2020 9:42:23 AM | P | PASS |
|
|
Final fire alarm inspection for scope of work is complete.
|
FIR20-00178
| INSP-Alarm Testing | 3/18/2020 | 3/20/2020 | 3/20/2020 9:41:14 AM | A | DONE |
|
|
Alarm testing is complete.
Request 10:00 am inspection for 1 speaker strobe relocation testing. Phone #: ###-#### Inspection requested via web by Joseph ATS Facility Systems
|
FIR20-00065
| INSP-Sprinkler Rough-in | 3/19/2020 | 3/20/2020 | 3/20/2020 8:13:04 AM | A | PASS |
|
|
Previously noted items have been corrected, all tenting in place at time of inspection, cover is approved. Approval sticker has been placed.
Call James when heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
FIR20-00066
| INSP-Sprinkler Rough-in | 3/19/2020 | 3/20/2020 | 3/20/2020 8:12:33 AM | A | PASS |
|
|
Previously noted items have been corrected, all tenting in place at time of inspection, cover is approved. Approval sticker has been placed.
Call James before heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
FIR19-00522
| INSP-Final Inspection | 3/17/2020 | 3/20/2020 | 3/20/2020 7:32:26 AM | A | FAIL |
|
|
Numerous walls have been added in one of the tenant spaces, TI is marked on city approved drawings. Wall layout affects audio visual coverage, floor plan must match approved drawings, inspection was stopped.
Needs to be done at 7:00am Phone #: ###-#### Inspection requested via web by Sam Ball
|