Inspections for the day of: Friday, March 6, 2020.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Page
TitleFIRE INSPECTOR
Phone #208-914-5431
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR19-00886 INSP-Sprinkler Rough-in3/6/20203/6/20203/6/2020 3:13:54 PMPPART
City approved plans have been notated with red ink hardlids approved for cover.

adam Phone #: ###-####
FIR19-00887 INSP-Final Inspection3/6/20203/6/20203/6/2020 12:53:56 PMPFAIL
Second escutcheon piece missing on 3 heads.

Phone #: ###-#### Inspection requested via web by jeremiah robison
FIR19-00743 INSP-Sprinkler Rough-in3/6/20203/6/20203/6/2020 11:39:21 AMPFAIL
11.2 K factor heads are installed in an area that shows 5.6, 5 heads in opne area, 2 11.2 heads installed in an area that shows 4 5.6 heads on city approved drawings, cover is not approved, inspection stopped due to defeciencies.

Contact Tanner Loomis ###-#### 30 min prior to RTC Insp start please, this will be for the B side or Area B

Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
BLD18-03143 FIRE-Final Inspection3/6/20203/6/20203/6/2020 11:00:03 AMPFAIL
Provide emergency egress public way lighting on nothwest stairwell at level 1 discharge as discussed. Provide proper freeze protection for dry pipe valve stairwell, southeast side. Install glass in fire rated doors from hotel section too garage. Dry system trip times for level 1 and 6 not met, no other dry systems were tested, sprinklers cannot be signed off for phase 1 until trip times are met. Inspection stopped due too defeciencies.



Phase 1 TCO final review and inspection walk for Fire Life Safety

Call adam when heading to the site. ###-#### Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD18-03143 FIRE-Conference3/6/20203/6/20203/6/2020 10:55:55 AMADONE
Fire conference is complete, no generator transfer performed due to other defeciencies that stopped inspections.

Emergency lighting test of genset system with ESI and RME Crew. Preferably late morning, after 10:00 am.

Call adam when heading to the site. ###-#### Phone #: ###-#### Inspection requested via web by Adam Johnson
FIR19-00761 INSP-Final Inspection3/5/20203/6/20203/6/2020 10:54:22 AMAPART
Elevator recall complete, initiating devices in pump room, garbage room, mech room next too fire pump room and fire panel heat have been tested. Level 1 garage dry system and level 6 dry system alarm pressure switches reported to panel, all other monitoring devices will need to be tested after trip times are corrected on dry systems, no other fire alarm associated devices for fire sprinkler monitoring have been tested. Monitoring has been verified.

Coordinated with Sprinkler contractor for 9AM inspection, Buck Phone #: ###-####
FIR19-00516 INSP-Final Inspection3/5/20203/6/20203/6/2020 10:50:54 AMAFAIL
Trip test time for level 1dry system with 2 open orifices was 1 minute and 2 seconds, level 6 dry system trip time was 1 minute and 12 seconds, per NFPA13, section 7.2.3.6.1, ordinary hazard with 2 open orifices trip time is required to be 50 seconds or less.

Tony Cetani is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
BLD19-03779 FIRE-Final Inspection3/4/20203/6/20203/6/2020 8:35:43 AMAFAIL
Could not access space due to being locked, provide code compliant door hardware on main entry.

Paul Phone #: ###-####
FIR20-00101 INSP-Final Inspection3/5/20203/6/20203/6/2020 8:30:17 AMAPASS
Final fire sprinkler inspection for area of work is complete.

Adam Phone #: ###-####
FIR19-00845 INSP-Final Inspection3/4/20203/6/20203/5/2020 11:42:31 AMACANC
Raul is the Contact Phone #: ###-#### >> Inspection requested via web by Chris Green Inspection cancelled from web by: Chris Green