Inspections for the day of: Wednesday, May 27, 2020.
Number of inspections: 21
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Page
TitleFIRE INSPECTOR
Phone #208-914-5431
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR19-00867 INSP-Sprinkler Rough-in/Hydro5/27/20205/27/20205/27/2020 3:07:41 PMPDONE
Hydrostsic test for underground supply witnessed, no pressure loss observed at gauge before backflow.

Underground hydro. Ready any time, call James before heading out. Phone #: ###-#### Inspection requested via web by Anthony Minichiello
FIR19-00869 INSP-Sprinkler Rough-in/Hydro5/27/20205/27/20205/27/2020 3:07:22 PMPDONE
Hydrostsic test for underground supply witnessed, no pressure loss observed at gauge before backflow.

Underground hydro. Ready any time, call James before heading out. Phone #: ###-#### Inspection requested via web by Anthony Minichiello
FIR19-00870 INSP-Sprinkler Rough-in/Hydro5/27/20205/27/20205/27/2020 3:07:02 PMPDONE
Hydrostsic test for underground supply witnessed, no pressure loss observed at gauge before backflow.

Underground hydro. Ready any time, call James before heading out. Phone #: ###-#### Inspection requested via web by Anthony Minichiello
FIR19-00864 INSP-Sprinkler Rough-in/Hydro5/27/20205/27/20205/27/2020 3:06:42 PMPDONE
Hydrostsic test for underground supply witnessed, no pressure loss observed at gauge before backflow.

Underground hydro. Ready any time, call James before heading out. Phone #: ###-#### Inspection requested via web by Anthony Minichiello
FIR19-00871 INSP-Sprinkler Rough-in/Hydro5/27/20205/27/20205/27/2020 3:06:21 PMPDONE
Hydrostsic test for underground supply witnessed, no pressure loss observed at gauge before backflow.

Underground hydro. Ready any time, call James before heading out. Phone #: ###-#### Inspection requested via web by Anthony Minichiello
FIR19-00872 INSP-Sprinkler Rough-in/Hydro5/27/20205/27/20205/27/2020 3:06:00 PMPDONE
Hydrostsic test for underground supply witnessed, no pressure loss observed at gauge before backflow.

Underground hydro. Ready any time, call James before heading out. Phone #: ###-#### Inspection requested via web by Anthony Minichiello
BLD19-03606 FIRE-Final Inspection5/21/20205/27/20205/27/2020 1:28:56 PMPPART
Final life fire safety inspection for TCO phase 1 level 1 is complete, signature for TCO phase 1 level 1 provided on permit sign off card.

Screened- Nathan Phone #: ###-####
FIR20-00166 INSP-Final Inspection5/27/20205/27/20205/27/2020 1:28:03 PMPPART
Final fire alarm inspection for TCO phase 1 level 1 is complete.

FIR20-00016 INSP-Final Inspection5/26/20205/27/20205/27/2020 1:27:28 PMPPART
Final fire sprinkler inspection for TCO phase 1 level 1 is complete.

Austin Farnworth is the contact Phone #: ###-#### Inspection requested via web by Stan Beus
FIR20-00121 INSP-Sprinkler Rough-in/Hydro5/27/20205/27/20205/27/2020 1:26:22 PMPDONE
Hydrostatic test for overhead fire sprinkler pipe has been witnessed, no pressure loss observed at riser provided gauge.
FIR20-00133 INSP-Sprinkler Rough-in/Hydro5/27/20205/27/20205/27/2020 1:26:06 PMPDONE
Hydrostatic test for overhead fire sprinkler pipe has been witnessed, no pressure loss observed at riser provided gauge.
FIR20-00130 INSP-Sprinkler Rough-in/Hydro5/27/20205/27/20205/27/2020 1:25:48 PMPDONE
Hydrostatic test for overhead fire sprinkler pipe has been witnessed, no pressure loss observed at riser provided gauge.
FIR20-00121 INSP-Sprinkler Rough-in5/26/20205/27/20205/27/2020 1:25:03 PMPPASS
Rough to cover inspection for overhead fire sprinkler piping is complete, all tenting in place at time of inspection. Cover is approved, cover approval sticker has been placed.

rough in and tenting Phone #: ###-#### Inspection requested via web by Jonathan Lee
FIR20-00133 INSP-Sprinkler Rough-in5/26/20205/27/20205/27/2020 1:24:44 PMPPASS
Rough to cover inspection for overhead fire sprinkler piping is complete, all tenting in place at time of inspection. Cover is approved, cover approval sticker has been placed.

rough in and tenting Phone #: ###-#### Inspection requested via web by Jonathan Lee
FIR20-00130 INSP-Sprinkler Rough-in5/26/20205/27/20205/27/2020 1:23:12 PMPPASS
Rough to cover inspection for overhead fire sprinkler piping is complete, all tenting in place at time of inspection. Cover is approved, cover approval sticker has been placed.

rough in and tenting Phone #: ###-#### Inspection requested via web by Jonathan Lee
FIR19-00516 INSP-Sprinkler Rough-in5/26/20205/27/20205/27/2020 10:34:17 AMAPART
Rough to cover inspection for lowered ceilings in suites on level 6 complete, lowered ceilings in suites on level 6 approved for cover.

Tony Cetani is the contact(: Phone #: ###-#### Inspection requested via web by Stan Beus
FIR20-00063 INSP-Sprinkler Rough-in/Hydro5/27/20205/27/20205/27/2020 10:18:16 AMPCANC
Underground hydro. Ready any time, call James before heading out. Phone #: ###-#### >> Inspection requested via web by Anthony Minichiello Inspection cancelled from web by: Anthony Minichiello
FIR20-00064 INSP-Sprinkler Rough-in/Hydro5/27/20205/27/20205/27/2020 10:18:14 AMPCANC
Underground hydro. Ready any time, call James before heading out. Phone #: ###-#### >> Inspection requested via web by Anthony Minichiello Inspection cancelled from web by: Anthony Minichiello
FIR20-00323 INSP-Final Inspection5/26/20205/27/20205/27/2020 8:30:59 AMAPASS
Final fire alarm inspection for scope of work is complete.

this has to be at 7 am, coordinated with hospital and elevator Phone #: ###-#### Inspection requested via web by Kristin Dolan
FIR20-00338 INSP-Final Inspection5/26/20205/27/20205/27/2020 8:30:32 AMAPASS
Final fire alarm inspection for scope of work is complete.

this has to be at 7 am, coordinated with hospital Phone #: ###-#### Inspection requested via web by Kristin Dolan
FIR20-00215 INSP-Sprinkler Rough-in5/22/20205/27/20205/22/2020 8:24:31 AMPCANC
Austin Farnworth is the contact Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus