Inspections for the day of: Wednesday, November 13, 2019.
Number of inspections: 33
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTell Riley
TitleBLD-COM/RES INSPECTOR
Phone #830-2752
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD19-03209 BLD-Ceiling Grid Inspection11/13/201911/13/201911/13/2019 4:04:37 PMPPART
Building B // Tom Phone #: ###-####//grid looks ok//pending mechanical inspection//
BLD19-03261 BLD-Framing/Rough-in11/12/201911/13/201911/13/2019 3:53:59 PMPFAIL
PJ Phone #: ###-####//need passed sprinkler rough in//fix cut stud//add truss hanger//call for reinspection//
BLD19-04479 BLD-Final11/12/201911/13/201911/13/2019 3:12:43 PMPPASS
Need final Phone #: ###-#### Inspection requested via web by Chris Howell//roof appears to be installed within code requirements//
BLD19-04479 DOC - Permit Finaled11/13/201911/13/201911/13/2019 3:11:51 PMPPASS
BLD19-02502 BLD-Footing11/12/201911/13/201911/13/2019 3:00:27 PMPPART
Concrete schedule to show up at 4 P.M tomorrow. Phone #: ###-#### Inspection requested via web by David Snow//ok pending specials//
BLD19-00212 BLD-Blower Door Test Results11/13/201911/13/201911/13/2019 2:44:29 PMPDONE
4.7 ACH 50
BLD19-00212 BLD-Final11/13/201911/13/201911/13/2019 2:43:15 PMPPASS
Phone #: ###-#### Inspection requested via web by James Jackson
BLD19-00212 DOC - Permit Finaled11/13/201911/13/201911/13/2019 2:43:06 PMPPASS
MIS19-00364 BLD-Conference11/6/201911/13/201911/13/2019 2:17:40 PMADONE
follow up work without permits....///permits obtained and finaled//
MIS19-00364 DOC - Permit Finaled11/13/201911/13/201911/13/2019 2:16:43 PMPPASS
BLD19-04431 BLD-Final11/13/201911/13/201911/13/2019 2:16:33 PMPPASS
Film was put on window to make tempered. Phone #: ###-#### Inspection requested via web by Viktoria McDonald//film installed for safety glazing//final complete//
BLD19-04431 DOC - Permit Finaled11/13/201911/13/201911/13/2019 2:16:21 PMPPASS
BLD19-04431 BLD-Conference11/13/201911/13/201911/13/2019 2:14:39 PMPCANC
Film was put on window to make tempered. Phone #: ###-#### Inspection requested via web by Viktoria McDonald
BLD19-03843 BLD-Wall cover11/13/201911/13/201911/13/2019 1:59:31 PMPPASS
Inspection requested via web by Brian Keeley
BLD16-01203 BLD-Conference11/13/201911/13/201911/13/2019 1:43:31 PMPDONE
Not building to plans // Doug White, ###-####//Permit shows expired on 11/13/2016// left CN//complaint was not building to plans//
BLD19-00553 BLD-Framing/Rough-in11/13/201911/13/201911/13/2019 1:27:26 PMPPART
call for access- Gary Phone #: ###-####//framing approved for existing conversion only//was discrepancies with previous inspection--walked through and ok to cover//will need to get certification/verification of pole structure by engineer as no inspections have been completed//
BLD19-00553 BLD-Wall Bracing11/13/201911/13/201911/13/2019 1:25:41 PMPCANC
call for access- Gary Phone #: ###-####
BLD19-00553 BLD-Foundation11/13/201911/13/201911/13/2019 1:25:30 PMPNR
Call for access- Gary Phone #: ###-####//gary will be getting back with me on the footings//engineer will need to verify structure as no inspections have been completed//
BLD19-02836 BLD-Final11/13/201911/13/201911/13/2019 12:31:42 PMPPASS
Angela Phone #: ###-####//corrections made//
BLD19-02836 DOC - Permit Finaled11/13/201911/13/201911/13/2019 12:31:24 PMPPASS
BLD19-00533 BLD-Footing11/12/201911/13/201911/13/2019 11:40:27 AMAPART
Pouring the footing for Building J tomorrow ( Wednesday) at 2pm. Phone #: ###-#### Inspection requested via web by Matt Perry//ok per plans pending specials//looked at footings for elevator as well--ok per details on structurals//
BLD08-00243 BLD-Final11/12/201911/13/201911/13/2019 11:01:51 AMAFAIL
David - please call for access Phone #: ###-####//need to add smoke carbon combos outside bedrooms to meet code requirements--appear to be interconnected//fix broken electrical outlet in basement//CN posted//
BLD19-00889 BLD-Final11/12/201911/13/201911/13/2019 10:26:02 AMAFAIL
Alex Phone #: ###-####//need blower door test//add step at door in garage//need fall prevention devices at windows with sill under 24" on 2nd floor//
BLD19-01655 BLD-Final11/12/201911/13/201911/13/2019 10:08:08 AMAFAIL
Alex Phone #: ###-####//need blower door test//need finals for mechanical and fireplace//
BLD19-03005 BLD-Energy code compliance11/12/201911/13/201911/13/2019 9:48:51 AMAPASS
bENJAMIN Phone #: ###-####//framing ok//insulation ok//no mechanical needed per Brian//
BLD19-04487 BLD-Final11/12/201911/13/201911/13/2019 9:36:40 AMAPASS
Walter Phone #: ###-####//new windows installed//exterior is sealed up//no changes in window size//
BLD19-04487 DOC - Permit Finaled11/13/201911/13/201911/13/2019 9:35:56 AMPPASS
BLD19-04195 BLD-Energy code compliance11/12/201911/13/201911/13/2019 9:27:54 AMAFAIL
Lucas Garcia Phone #: ###-####//wall with new door due to damage is not insulated//
BLD19-01619 BLD-Framing/Rough-in11/12/201911/13/201911/13/2019 9:14:57 AMAPART
Jean Phone #: ###-####//seal holes through floor//provide truss fix for cut gable trusses//ok to insulate only//
BLD18-02427 BLD-Final11/12/201911/13/201911/13/2019 8:54:10 AMAFAIL
George Phone #: ###-####//still need fall prevention devices on windows in master bedroom//ACH is still not posted//
BLD18-02896 BLD-Aging Inspection11/13/201911/13/201911/13/2019 8:12:55 AM CANC
BLD18-02635 BLD-Aging Inspection11/13/201911/13/201911/13/2019 8:12:24 AM CANC
Expires: 12/28/19
BLD18-02428 BLD-Final11/12/201911/13/201911/13/2019 8:11:45 AMACANC
George Phone #: ###-####//spoke with George--still needs mechanical final for the gas fireplace//