BLD18-03962
| BLD-Aging Inspection | 12/27/2019 | 12/27/2019 | 12/31/2019 7:21:52 AM | | DONE |
|
|
no permit activity or inspections//Expires: 02/11/20
|
BLD17-00258
| BLD-Aging Inspection | 12/27/2019 | 12/27/2019 | 12/31/2019 7:20:42 AM | | DONE |
|
|
|
BLD18-02940
| BLD-Aging Inspection | 12/27/2019 | 12/27/2019 | 12/31/2019 7:19:40 AM | | DONE |
|
|
Expires: 02/10/20
|
BLD19-03145
| BLD-Energy code compliance | 12/27/2019 | 12/27/2019 | 12/27/2019 4:11:28 PM | P | PASS |
|
|
Duane Phone #: ###-####//ok per provided REScheck evaluation for R38 in attic//
|
BLD19-01143
| BLD-Final | 12/27/2019 | 12/27/2019 | 12/27/2019 4:10:33 PM | P | PASS |
|
|
garage code 3162 Phone #: ###-#### Inspection requested via web by Kelly Stover
|
BLD19-01143
| DOC - Permit Finaled | 12/27/2019 | 12/27/2019 | 12/27/2019 4:10:22 PM | P | PASS |
|
|
|
BLD16-00703
| BLD-Conference | 12/27/2019 | 12/27/2019 | 12/27/2019 3:04:32 PM | P | DONE |
|
|
Check on activity onsite//left message with contact to call regarding permit, still needs final for electrical as well//
|
BLD19-03209
| BLD-Framing/Rough-in | 12/26/2019 | 12/27/2019 | 12/27/2019 2:31:49 PM | P | PART |
|
|
Tom Phone #: ###-####//phase 2 wall framing--areas without plumbing--ok to cover//
|
BLD18-02167
| BLD-Conference | 12/27/2019 | 12/27/2019 | 12/27/2019 1:42:54 PM | P | DONE |
|
|
Nelson Phone #: ###-####//two windows above showers will not need to be tempered--above 5 ft of we surface//large window above tub will require to be tempered per the plans//
|
BLD19-03145
| BLD-Wall cover | 12/26/2019 | 12/27/2019 | 12/27/2019 1:29:29 PM | A | CANC |
|
|
call for access // Duane Phone #: ###-####
|
BLD19-04680
| BLD-Framing/Rough-in | 12/27/2019 | 12/27/2019 | 12/27/2019 1:03:45 PM | P | DONE |
|
|
Call to meet // Roger Phone #: ###-####/conference on framing questions and project//
|
BLD19-03657
| BLD-Framing/Rough-in | 12/27/2019 | 12/27/2019 | 12/27/2019 12:32:22 PM | P | PART |
|
|
Phone #: ###-#### Inspection requested via web by Kelly Stover//ok to insulate,, check bathroom doorway header, hangers at landing//CN posted//
|
BLD19-03659
| BLD-Framing/Rough-in | 12/27/2019 | 12/27/2019 | 12/27/2019 12:31:30 PM | P | PART |
|
|
Phone #: ###-#### Inspection requested via web by Kelly Stover//ok to insulate//check hangers at landing, and truss bracing//
|
BLD19-01686
| BLD-Final | 12/27/2019 | 12/27/2019 | 12/27/2019 11:40:08 AM | P | NR |
|
|
garage code 3162 Phone #: ###-#### Inspection requested via web by Kelly Stover//need electrical final//
|
BLD19-01143
| BLD-Blower Door Test Results | 12/27/2019 | 12/27/2019 | 12/27/2019 11:39:38 AM | P | DONE |
|
|
5.9 ACH 50
|
BLD19-01686
| BLD-Blower Door Test Results | 12/27/2019 | 12/27/2019 | 12/27/2019 11:38:59 AM | P | DONE |
|
|
4.7 ACH 50
|
BLD19-02383
| BLD-Final | 12/26/2019 | 12/27/2019 | 12/27/2019 11:09:39 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by James Jackson//corrections made//
|
BLD19-02383
| DOC - Permit Finaled | 12/27/2019 | 12/27/2019 | 12/27/2019 11:09:19 AM | P | PASS |
|
|
|
BLD19-02383
| BLD-Blower Door Test Results | 12/27/2019 | 12/27/2019 | 12/27/2019 11:09:03 AM | A | DONE |
|
|
4.8 ACH 50
|
BLD19-00676
| BLD-Final | 12/26/2019 | 12/27/2019 | 12/27/2019 10:50:30 AM | A | NR |
|
|
Call 1 hour ahead- Peter Phone #: ###-####/need to add smoke CO detectors per code//garage and vestibule complete//
|
BLD19-04205
| BLD-Wall Bracing | 12/26/2019 | 12/27/2019 | 12/27/2019 10:49:36 AM | A | PASS |
|
|
concrete at 11 pm // Brian Phone #: ###-####//setbacks per plan//wall ok to pour//blankets onsite// frost protection required//
|
BLD19-03693
| BLD-Framing/Rough-in | 12/26/2019 | 12/27/2019 | 12/27/2019 10:48:51 AM | A | PASS |
|
|
Kristina Phone #: ###-####//ok to insulate//fix truss bracing//
|
BLD19-04581
| BLD-Final | 12/26/2019 | 12/27/2019 | 12/27/2019 10:01:13 AM | A | PASS |
|
|
Final roofing Phone #: ###-#### Inspection requested via web by Frank Roman//roof appears to be installed within code requirements//
|
BLD19-04581
| DOC - Permit Finaled | 12/27/2019 | 12/27/2019 | 12/27/2019 10:00:40 AM | P | PASS |
|
|
|
BLD19-03145
| DOC - Permit Finaled | 12/27/2019 | 12/27/2019 | 12/27/2019 9:51:28 AM | P | CANC |
|
|
(This activity was added in error so we have changed the case status back to Issued.)
|
BLD19-02795
| BLD-Final | 12/26/2019 | 12/27/2019 | 12/27/2019 9:29:46 AM | A | FAIL |
|
|
call for access // Gari Phone #: ###-####//Child fall protectionf needed for window in bonus room//safety glazing needed in window in side bathroom//CN posted//
|
BLD19-02599
| BLD-Final | 12/26/2019 | 12/27/2019 | 12/27/2019 9:10:12 AM | A | FAIL |
|
|
Call for access // Anthony Phone #: ###-####//remove dust covers from smoke/co detectors//step at garage man door is over 8"--IRC max is 7 3/4"//CN posted//
|
MIS19-00419
| BLD-Conference | 12/12/2019 | 12/27/2019 | 12/27/2019 8:26:16 AM | A | DONE |
|
|
follow up//permits were issued for building, plumbing and electrical//
|
MIS19-00419
| DOC - Permit Finaled | 12/27/2019 | 12/27/2019 | 12/27/2019 8:25:50 AM | P | PASS |
|
|
|