Inspections for the day of: Wednesday, April 8, 2020.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTell Riley
TitleBLD-COM/RES INSPECTOR
Phone #830-2752
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD19-01887 BLD-Aging Inspection4/8/20204/8/20204/9/2020 8:48:14 AM PEND
BLD19-01722 BLD-Aging Inspection4/8/20204/8/20204/9/2020 8:47:49 AM PEND
BLD19-02923 BLD-Aging Inspection4/8/20204/8/20204/9/2020 8:46:41 AM PEND
BLD20-00380 BLD-Wall Bracing4/8/20204/8/20204/8/2020 3:16:51 PMPPART
Randy **left voicemail** Phone #: ###-####//interior separation walls ok, two areas are gb braced wall panels ok per plans//
BLD19-00556 BLD-Final4/7/20204/8/20204/8/2020 3:15:59 PMPFAIL
Phone #: ###-#### Inspection requested via web by Damion Jordan//CN issued//need to finish backfill around foundation on west and south side//need blower door test//need to post insulation certificate//need to complete shared driveway and turnaround or provide zoning approval//add house numbers to home//
BLD19-03656 BLD-Framing/Rough-in4/8/20204/8/20204/8/2020 2:35:54 PMPFAIL
Vence ** cleared** Phone #: ###-####//CN issued//previous wall bracing corrections have not been addressed//plans are missing 1/2 pages ripped some areas missing//need to provide engineering documents//previous corrections were marked in red on floors//complete inspection was not completed due to missing engineering/plans//
BLD19-04441 BLD-Framing/Rough-in4/8/20204/8/20204/8/2020 1:11:01 PMPFAIL
Phone #: ###-#### Inspection requested via web by Kelly Stover//need mechanical//see CN oniste//
BLD19-00323 BLD-Conference4/8/20204/8/20204/8/2020 12:38:20 PMPDONE
conference with contractor, mechanical contractor and inspectors, was scheduled under wrong permit//will need to have calcs and engineers approval and or fix for RTU units that have changed location and size, drawings including mechanical will need to be submitted for plan modification//
BLD19-00541 BLD-Conference4/7/20204/8/20204/8/2020 12:07:34 PMPCANC
*screened* - Ken Phone #: ###-####//scheduled under wrong permit//
BLD20-00875 BLD-Footing4/7/20204/8/20204/8/2020 11:01:35 AMAPART
Call before coming-Brian **cleared** Phone #: ###-####//ok when rebar is not touching earth, pad footing needs to bump out to 5 feet//setbacks appear to meet aproved plans//
BLD20-00656 BLD-Ceiling Grid Inspection4/7/20204/8/20204/8/2020 11:00:32 AMAPEND
Please call 30 mins ahead- Lloyd **cleared** Phone #: ###-####//ok, pending electrical isnpection for grid//
BLD19-04887 BLD-Framing/Rough-in4/7/20204/8/20204/8/2020 10:11:36 AMANR
screened // nail pattern // Brett Phone #: ###-####//need to have shear plans/design match what is onsite//refered them back to designer to re calc the wall bracing accordingly//
BLD19-00064 BLD-Ceiling Grid Inspection4/7/20204/8/20204/8/2020 9:07:22 AMAPASS
*screened* - Jay Phone #: ###-####//music room grid ok//
BLD19-04441 BLD-Framing/Rough-in4/7/20204/8/20204/8/2020 8:18:52 AMACANC
Phone #: ###-#### >> Inspection requested via web by Kelly Stover Inspection cancelled from web by: Kelly Stover