BLD19-03409
| BLD-Aging Inspection | 8/3/2020 | 8/3/2020 | 8/4/2020 9:41:52 AM | | PEND |
|
|
no inspections requested
|
BLD20-01397
| BLD-Framing/Rough-in | 8/3/2020 | 8/3/2020 | 8/3/2020 3:47:52 PM | P | PASS |
|
|
call 15 mins-Gabe- *screened* Phone #: ###-####//truss corrections have been completed//
|
BLD20-01768
| BLD-Footing | 7/31/2020 | 8/3/2020 | 8/3/2020 3:40:36 PM | P | PART |
|
|
SCREENED // Pat Phone #: ###-####//WIP//double check setbacks at wall inspection//
|
BLD20-01731
| BLD-Footing | 7/31/2020 | 8/3/2020 | 8/3/2020 3:40:18 PM | P | PART |
|
|
SCREENED // Pat Phone #: ###-####//WIP//double check setbacks at wall inspection//
|
BLD20-01891
| BLD-Final | 7/31/2020 | 8/3/2020 | 8/3/2020 2:55:39 PM | P | NR |
|
|
SCREENED // Todd Phone #: ###-####//see Todd for correction notice for final finishes for accessible routes, finishes and restrooms//
|
BLD20-00089
| BLD-Footing | 8/3/2020 | 8/3/2020 | 8/3/2020 2:10:41 PM | P | PART |
|
|
3pm or around there please. Call Shawn on the way there. ###-#### Phone #: ###-#### Inspection requested via web by Shawn Plimmer//building appears to be within setbacks, was moved forward 7 inches to meet rear setbacks//contractor will submit plan modificaiton for adjusted site plan//rebar appears to be per the plan//
|
BLD19-04576
| BLD-Final | 8/3/2020 | 8/3/2020 | 8/3/2020 1:21:05 PM | P | PASS |
|
|
Screened- Willy Phone #: ###-####
|
BLD19-04576
| DOC - Permit Finaled | 8/3/2020 | 8/3/2020 | 8/3/2020 1:20:55 PM | P | PASS |
|
|
|
BLD19-04576
| BLD-Blower Door Test Results | 8/3/2020 | 8/3/2020 | 8/3/2020 1:20:42 PM | P | DONE |
|
|
4.97 ACH 50
|
BLD20-01926
| BLD-Footing | 7/31/2020 | 8/3/2020 | 8/3/2020 12:36:37 PM | A | PEND |
|
|
LATE AM inspection requested if at all possible. Phone #: ###-#### Inspection requested via web by David Dexter//site plan does not reflect onsite conditions, shows cover on north west corner of house, actually will be located on northeast--need to submit new site plan to relect actual conditions onsite, and east side property setbacks//footings appear to meet minimum depth and width per the engineering//pour at own risk if completed prior to updated site plan//
|
BLD19-03475
| BLD-Conference | 7/27/2020 | 8/3/2020 | 8/3/2020 10:56:12 AM | A | DONE |
|
|
another correction notice issued as I do not see where plan modification has been submitted/recieved on PDS//follow up 5 days//
|
BLD19-03209
| BLD-Framing/Rough-in | 7/31/2020 | 8/3/2020 | 8/3/2020 10:39:24 AM | A | PART |
|
|
Give Tom a call when in route. Phone #: ###-#### Inspection requested via web by tom mccalister//phase 4 temp ok pending fire life safety temp//phase 5 framing of training room and vestibule ok per plans//
|
BLD20-00774
| BLD-Framing/Rough-in | 8/3/2020 | 8/3/2020 | 8/3/2020 10:10:18 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Kelly Stover//Trimmers added under blocking used for truss hanger attachment, creating headers at 14" wide, load paths are now supported//energy ok//
|
BLD19-04500
| BLD-Footing | 7/31/2020 | 8/3/2020 | 8/3/2020 9:15:49 AM | A | PART |
|
|
SCREENED // Pat Phone #: ###-####//ok per plans//setbacks verified by record of survey points and measurements from existing house as per the survey provided by the general contractor and the approved plans//
|