Inspections for the day of: Monday, August 3, 2020.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTell Riley
TitleBLD-COM/RES INSPECTOR
Phone #830-2752
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD19-03409 BLD-Aging Inspection8/3/20208/3/20208/4/2020 9:41:52 AM PEND
no inspections requested
BLD20-01397 BLD-Framing/Rough-in8/3/20208/3/20208/3/2020 3:47:52 PMPPASS
call 15 mins-Gabe- *screened* Phone #: ###-####//truss corrections have been completed//
BLD20-01768 BLD-Footing7/31/20208/3/20208/3/2020 3:40:36 PMPPART
SCREENED // Pat Phone #: ###-####//WIP//double check setbacks at wall inspection//
BLD20-01731 BLD-Footing7/31/20208/3/20208/3/2020 3:40:18 PMPPART
SCREENED // Pat Phone #: ###-####//WIP//double check setbacks at wall inspection//
BLD20-01891 BLD-Final7/31/20208/3/20208/3/2020 2:55:39 PMPNR
SCREENED // Todd Phone #: ###-####//see Todd for correction notice for final finishes for accessible routes, finishes and restrooms//
BLD20-00089 BLD-Footing8/3/20208/3/20208/3/2020 2:10:41 PMPPART
3pm or around there please. Call Shawn on the way there. ###-#### Phone #: ###-#### Inspection requested via web by Shawn Plimmer//building appears to be within setbacks, was moved forward 7 inches to meet rear setbacks//contractor will submit plan modificaiton for adjusted site plan//rebar appears to be per the plan//
BLD19-04576 BLD-Final8/3/20208/3/20208/3/2020 1:21:05 PMPPASS
Screened- Willy Phone #: ###-####
BLD19-04576 DOC - Permit Finaled8/3/20208/3/20208/3/2020 1:20:55 PMPPASS
BLD19-04576 BLD-Blower Door Test Results8/3/20208/3/20208/3/2020 1:20:42 PMPDONE
4.97 ACH 50
BLD20-01926 BLD-Footing7/31/20208/3/20208/3/2020 12:36:37 PMAPEND
LATE AM inspection requested if at all possible. Phone #: ###-#### Inspection requested via web by David Dexter//site plan does not reflect onsite conditions, shows cover on north west corner of house, actually will be located on northeast--need to submit new site plan to relect actual conditions onsite, and east side property setbacks//footings appear to meet minimum depth and width per the engineering//pour at own risk if completed prior to updated site plan//
BLD19-03475 BLD-Conference7/27/20208/3/20208/3/2020 10:56:12 AMADONE
another correction notice issued as I do not see where plan modification has been submitted/recieved on PDS//follow up 5 days//
BLD19-03209 BLD-Framing/Rough-in7/31/20208/3/20208/3/2020 10:39:24 AMAPART
Give Tom a call when in route. Phone #: ###-#### Inspection requested via web by tom mccalister//phase 4 temp ok pending fire life safety temp//phase 5 framing of training room and vestibule ok per plans//
BLD20-00774 BLD-Framing/Rough-in8/3/20208/3/20208/3/2020 10:10:18 AMAPASS
Phone #: ###-#### Inspection requested via web by Kelly Stover//Trimmers added under blocking used for truss hanger attachment, creating headers at 14" wide, load paths are now supported//energy ok//
BLD19-04500 BLD-Footing7/31/20208/3/20208/3/2020 9:15:49 AMAPART
SCREENED // Pat Phone #: ###-####//ok per plans//setbacks verified by record of survey points and measurements from existing house as per the survey provided by the general contractor and the approved plans//