ESC19-00324
| General Inspection | 3/4/2020 | 3/4/2020 | 3/5/2020 4:22:39 PM | | PART |
|
|
Joint trenching around perimeter is still not complete and the silt fence perimeter is not installed/repair.
On the upper portion, crews are installing sidewalk and small retaining walls between lots. New top of slope berms have been installed.
Concrete washout pan is onsite.
Corrections:
- re-install perimeter silt fence ASAP - install stormwater control berms, perimeter silt fence and implement ground stabilization for the central common area.
|
ESC19-00264
| Aging Inspection | 3/4/2020 | 3/4/2020 | 3/4/2020 4:06:56 PM | | CANC |
|
|
|
ESC18-01142
| General Inspection | 3/4/2020 | 3/4/2020 | 3/4/2020 11:21:32 AM | | PEND |
|
|
Builder to schedule conference prior to resuming activity at site.
Damion notified
|
ESC07-00733
| DOC - Permit Finaled | 3/4/2020 | 3/4/2020 | 3/4/2020 9:16:26 AM | P | PASS |
|
|
No disturbed area, excavation occured in the past and this was a re-issued permit
|