ESC16-00935
| General Inspection | 4/27/2020 | 4/27/2020 | | | |
|
|
|
ESC20-00509
| Site Preparation | 4/28/2020 | 4/29/2020 | 5/6/2020 2:02:23 PM | A | PASS |
|
|
RP on duty and work approved to begin
|
ESC19-01049
| Site Final | 4/29/2020 | 4/29/2020 | 4/30/2020 11:51:10 AM | P | PASS |
|
|
Site stabilized and cleaned up. All temporary BMPs have been removed
|
ESC19-01341
| General Inspection | 4/29/2020 | 4/29/2020 | 4/29/2020 4:53:41 PM | P | PASS |
|
|
discuss stabilization and wattle installation
Approved to make field change to ESC plan.
No wattle intervals on slope because it is already tracked and is to be hydroseeded with mulch and native dryland seed. Upland water drains other direction at the top of the slope as requested. The slope is very steep and has had no erosion occur with no stabilization or other controls on it, so with tracking and hydroseed it should be adequate erosion control.
Requested that wattle be installed on downhill side of small drainage basin at bottom of hill and one row just above the final discharge point to the vegetation below.
Notified RP to pay outstanding fine for concrete washout violation
|
ESC19-01646
| General Inspection | 4/29/2020 | 4/29/2020 | 4/29/2020 2:38:11 PM | P | FAIL |
|
|
Perimter wattle not installed correctly.
Dirt running off site, dirt around storm drain that doesn't have sediment protection.
RP listed unresponsive. Notified builder.Jeff
|
ESC19-00301
| Site Final | 4/29/2020 | 4/29/2020 | 4/29/2020 1:54:00 PM | P | PASS |
|
|
Project is complete Phone #: ###-#### Inspection requested via web by Eldon Oyadomari
No disturbed area remaining, no temp BMPs. ESC permit finaled.
|
ESC19-01577
| General Inspection | 4/29/2020 | 4/29/2020 | 4/29/2020 1:14:01 PM | P | PASS |
|
|
BMPs installed. Concrete washout pan onsite and was used for foundation. No trackout, workers parking on pavement.
Approved.
GC Randy will be onsite regularly and can manage correction requests ###-####
|
ESC19-01577
| Site Preparation | 4/29/2020 | 4/29/2020 | 4/29/2020 1:11:54 PM | P | FAIL |
|
|
No site prep requested. No runoff or issues, BMPs installed.
Notified builder and excavator to make sure to schedule the ESC site preparation inspection for foothills residential homes.
|
ESC19-01232
| General Inspection | 4/29/2020 | 4/29/2020 | 4/29/2020 12:36:09 PM | P | PASS |
|
|
|
ESC16-00406
| General Inspection | 4/29/2020 | 4/29/2020 | 4/29/2020 12:29:15 PM | | PASS |
|
|
BMPs installed. RP on site daily. DI bags in phase one have all been changed out/maintained as requested. Subdivsion concrete washout facility provided for home construction.
No corrections requested.
|
ESC19-01657
| Site Final | 4/29/2020 | 4/29/2020 | 4/29/2020 12:27:40 PM | P | PASS |
|
|
Rock retaining wall installed. Site cleaned up. No ESC issues. Permit closed. Lot is now prepped for home construction
|
ESC19-01205
| Site Final | 4/29/2020 | 4/29/2020 | 4/29/2020 12:24:02 PM | P | PASS |
|
|
HOme complete and landscaped. DI bags to remain in receiving storm drains for ongoing construction in Highlands Cove
|
ESC19-00617
| Aging Inspection | 4/29/2020 | 4/29/2020 | 4/29/2020 8:23:41 AM | | CANC |
|
|
|
ESC19-00558
| Aging Inspection | 4/29/2020 | 4/29/2020 | 4/29/2020 8:20:23 AM | | CANC |
|
|
|