ESC19-00086
| General Inspection | 5/22/2020 | 5/22/2020 | 5/29/2020 8:07:41 AM | | CANC |
|
|
|
ESC18-01089
| General Inspection | 5/22/2020 | 5/22/2020 | 5/27/2020 2:45:15 PM | | PASS |
|
|
Homes on Foxgrove in progress. BMPs installed., regular street sweeping scheduled. No corrections requested
|
ESC20-00490
| Site Preparation | 5/19/2020 | 5/22/2020 | 5/27/2020 2:44:20 PM | P | CANC |
|
|
No activity at site yet. RP-GC has beeen notified to set up site preparation inspection
|
ESC18-00020
| General Inspection | 5/22/2020 | 5/22/2020 | 5/27/2020 8:31:39 AM | | PASS |
|
|
WIP on homes. No new subdivision development activity on upper phase. Storm drains have sediment protection, concrete washout facility in good condition. No hillside erosion or sediment blowout observed.
Rear hillside drainage with rip rap channel off Trapper seems to have held up during the last rain. The TRM installed at base of riprap has stayed in place and area is vegetating. No significant amounts of mud acuumulated in channel found.
|
ESC19-00324
| General Inspection | 5/22/2020 | 5/22/2020 | 5/22/2020 5:45:22 PM | P | PEND |
|
|
Clean up of streets is complete. WIP on Teresa connection to Warm Springs. Storm drain sediment bags have been maintained.
Added wattle and silt fence perimter on the section of slope that had erosion and blow out occur. SIlt fence properly installed and J-hooked.
Corrections remaining: - clean up mud in drainage ditch. - stabilize all disturbed area that is out of compliance with stabilization deadlines.
|
ESC19-01706
| Complaint Inspection | 5/22/2020 | 5/22/2020 | 5/22/2020 5:41:30 PM | P | PEND |
|
|
dumping concrete washout?
RP states no concrete has been poured for 3 weeks at the site.
1 or 2 piles of dumped concrete material, also looks like some stucco. Will have the swale cleaned and investigate who may have dumped the material
|
ESC19-00584
| General Inspection | 5/22/2020 | 5/22/2020 | 5/22/2020 5:38:36 PM | | PASS |
|
|
DI bags installed. Active projects by Black Rock have lined concrete washout.
|
ESC17-00078
| General Inspection | 5/22/2020 | 5/22/2020 | 5/22/2020 5:37:49 PM | | PASS |
|
|
|
ESC18-00983
| General Inspection | 5/22/2020 | 5/22/2020 | 5/22/2020 4:07:40 PM | P | PASS |
|
|
No hillside erosion issues observed after large rain event. HOmes permitted separately by Black Rock
|
ESC19-01473
| BMP Violation | 5/22/2020 | 5/22/2020 | 5/22/2020 3:45:03 PM | P | FAIL |
|
|
No stabilized entrance to concrete washout facility. Trackout on Tornak and Tiger Lily,
Notified Blackrock RP to fix early next week. Follow up scheduled
|
ESC19-00756
| Site Final | 5/22/2020 | 5/22/2020 | 5/22/2020 3:33:56 PM | P | PASS |
|
|
Homeowner has revegetated with weeds and debris. No material leaving site. No ESC requests for permitee, no further ESC inspections
Bond issued by Public Works for reveg/site stablization in February 2020
|
ESC19-01756
| Site Final | 5/22/2020 | 5/22/2020 | 5/22/2020 3:32:22 PM | P | PASS |
|
|
Pool complete. No ESC requests, all permits finaled.
|
ESC19-00943
| Site Final | 5/21/2020 | 5/22/2020 | 5/22/2020 3:27:15 PM | P | PASS |
|
|
Home complete, landscaped and occupied. Pile construction waste and stockpile of dirt on adjacent lot. Previously it was decided that this mess is not part of this project.
No complaints about lot received, so assume lot owner has allowed it. NO ESC requestes.
|
ESC18-00979
| Site Final | 5/22/2020 | 5/22/2020 | 5/22/2020 3:13:57 PM | P | PASS |
|
|
Work complete. BLD permit finaled. Stormwater retainined on WPS site. No offsite BMPs to be removed. ESC permit finaled, no ESC requests.
|
ESC19-00928
| Site Final | 5/22/2020 | 5/22/2020 | 5/22/2020 9:48:37 AM | P | PASS |
|
|
Project complete, clean and stabilzed. No ESC requests. A job well done!
|
ESC19-00928
| Aging Inspection | 5/22/2020 | 5/22/2020 | 5/22/2020 9:47:47 AM | | CANC |
|
|
|
ESC19-00971
| Aging Inspection | 5/22/2020 | 5/22/2020 | 5/22/2020 9:43:37 AM | | CANC |
|
|
|
ESC19-00581
| General Inspection | 5/22/2020 | 5/22/2020 | 5/22/2020 9:00:48 AM | | CANC |
|
|
inspections to be covered under the RCH construction permit, ESC19-00091.
BLD permit for pool has been inactive for 10 months
|
ESC19-00581
| DOC - Permit Finaled | 5/22/2020 | 5/22/2020 | 5/22/2020 8:50:20 AM | P | PASS |
|
|
|
ESC18-01635
| Aging Inspection | 5/22/2020 | 5/22/2020 | 5/22/2020 8:48:43 AM | | CANC |
|
|
|
ESC19-00744
| Aging Inspection | 5/22/2020 | 5/22/2020 | 5/22/2020 8:19:44 AM | | CANC |
|
|
rescheduled for site final
|
ESC19-00747
| Aging Inspection | 5/22/2020 | 5/22/2020 | 5/22/2020 8:19:31 AM | | CANC |
|
|
rescheduled for site final
|
ESC19-00182
| General Inspection | 5/22/2020 | 5/22/2020 | 5/22/2020 8:18:36 AM | | CANC |
|
|
|
ESC19-00184
| General Inspection | 5/22/2020 | 5/22/2020 | 5/22/2020 8:18:24 AM | | CANC |
|
|
|
ESC19-00183
| General Inspection | 5/22/2020 | 5/22/2020 | 5/22/2020 8:18:10 AM | | CANC |
|
|
|