ESC18-01682
| General Inspection | 11/21/2019 | 11/21/2019 | 11/22/2019 10:04:01 AM | | PASS |
|
|
Met with homeowner and foreman on site. ADU work nearly completed. Concrete is done with pouring, one spot of washout that they will get clean, rest was properly disposed. WANT TO CHANGE CONCRETE WALL TO ROCK, TOLD THEM THEY NEED TO GET A PLAN MOD TO ENGINEERING, NOT TO P[LACE ROCKS UNTIL ALL IS APPROVED.
|
ESC17-01601
| Aging Inspection | 11/21/2019 | 11/21/2019 | 11/21/2019 2:08:01 PM | | DEFR |
|
|
Behind home.
|
ESC18-01649
| Aging Inspection | 11/21/2019 | 11/21/2019 | 11/21/2019 2:01:12 PM | | CANC |
|
|
|
ESC18-01649
| DOC - Permit Finaled | 11/21/2019 | 11/21/2019 | 11/21/2019 2:01:07 PM | P | PASS |
|
|
|
ESC17-00985
| General Inspection | 11/21/2019 | 11/21/2019 | 11/21/2019 1:57:45 PM | | PASS |
|
|
|
ESC17-01632
| General Inspection | 11/21/2019 | 11/21/2019 | 11/21/2019 1:51:30 PM | | PASS |
|
|
Met with PM Ken on site. Gave a reminder about trackout and be ready for winter. Site is clean, only issue is 1 of the washouts by the masons is overfilled and some has spilled out.
|
ESC17-00954
| General Inspection | 11/21/2019 | 11/21/2019 | 11/21/2019 12:23:34 PM | | PASS |
|
|
Subdivision is clean. No issues after walk through with rp.
|
ESC18-01244
| General Inspection | 11/21/2019 | 11/21/2019 | 11/21/2019 12:19:04 PM | | PASS |
|
|
Perimeter is protected with gatorguard, no grass or ground cover. Trash has been cleaned up. Pipe still coming out of retaining wall.
|
ESC18-01433
| General Inspection | 11/21/2019 | 11/21/2019 | 11/21/2019 12:09:11 PM | | PASS |
|
|
Eagle landscape on site. Not stabalized yet.
|
ESC19-00038
| Aging Inspection | 11/21/2019 | 11/21/2019 | 11/21/2019 11:45:19 AM | | CANC |
|
|
|
ESC19-00038
| DOC - Permit Finaled | 11/21/2019 | 11/21/2019 | 11/21/2019 11:45:15 AM | P | PASS |
|
|
|
ESC18-00020
| General Inspection | 11/13/2019 | 11/21/2019 | 11/21/2019 11:30:02 AM | A | PASS |
|
|
Talked with Kyle while at site. Middle section has water bars installed and an extended entrance. Gate is locked, end of sidewalk barricade with no tresspassing sign to be reinstalled. Wattle checks along entrance. Crew on site changing DI bags. Wind blown trash has been cleaned from IDFG property. Wattle, gravel bags, and boulders installed below end of rock drainage. Gatorguard installed at gate that accesses Suez tank. Wattles installed at bottom of steeper grades on Foxgrove.
|
ESC18-01697
| Aging Inspection | 11/21/2019 | 11/21/2019 | 11/21/2019 10:37:50 AM | | PASS |
|
|
WIP on block, no ESC issues.
|
ESC18-01695
| Aging Inspection | 11/21/2019 | 11/21/2019 | 11/21/2019 10:33:34 AM | | PASS |
|
|
WIP on block, no issues.
|
ESC19-00509
| General Inspection | 11/20/2019 | 11/21/2019 | 11/21/2019 9:32:27 AM | P | PASS |
|
|
Concrete crew setting forms and bar, have inspection scheduled for afternoon. Washout on location, not lined, box of poly is right in front of washout. Site is clean.
|
ESC19-01069
| General Inspection | 11/20/2019 | 11/21/2019 | 11/21/2019 9:27:33 AM | P | PASS |
|
|
No new activity at site. Utilities look completed, pad area graded.
|