FIRE-Final Inspection | 7/5/2000 | 7/5/2000 | 7/5/2000 | P | CANC |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 07/05/2000 at 10:57:47. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 07/05/2000 at 11:21:12.
|
BLD-Final | 5/23/2000 | 5/24/2000 | 5/24/2000 | A | PASS |
|
|
|
josh ###-#### c/c# 19344 5/25/00 10:40:46 AM
|
FIRE-Final Inspection | 5/23/2000 | 5/23/2000 | 5/23/2000 | P | PASS |
Rick Jackson
|
|
|
###-#### Josh
|
BLD-Final | 5/18/2000 | 5/19/2000 | 5/19/2000 | P | FAIL |
|
|
|
Scheduled by a contractor via Hello! on 05/18/2000 at 16:30:00. Contact: ###-####. fire c/n 5/19/00 12:39:00 PM
|
FIRE-Final Inspection | 5/18/2000 | 5/18/2000 | 5/18/2000 | P | FAIL |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 05/18/2000 at 10:14:32. Contact: ###-####. Exposed combustible surface in central stair require sprinklering or covering with non-combustible surfaces. 5/22/00 9:00:55 AM
|
BLD-Other | 3/16/2000 | 3/16/2000 | 3/16/2000 | A | FAIL |
|
|
|
as I was notified that there was a possible exiting violation at the building, upon arival I observed that there was scaffolding installed in the main stair blocking exiting from the 3rd floor I served a correction notice to the contractor that the building must always have 2 exits from the upper floors during busness hours and that the tenants must be notified of after hours construction and possible exit blocking at these times. the contractor at that time started dismanteling the scaffolding. 03/17/2000 9:04:28 AM
|
BLD-Conference | 3/1/2000 | 3/1/2000 | 3/1/2000 | P | PART |
|
|
|
Josh ###-#### ok to cover corridor to lobby walls 3/2/00 8:20:08 AM
|