BLD-Final | 11/15/2000 | 11/16/2000 | 11/16/2000 | P | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 11/15/2000 at 13:22:53. Contact: ###-####. ok pending fire safety sign off. 11/16/2000 3:15:51 PM
|
FIRE-Final Inspection | 11/15/2000 | 11/16/2000 | 11/16/2000 | P | PASS |
Joe Tawney
|
|
|
###-####. Reinsp OK for permanant occupancy 11/17/2000 7:59:25 AM
|
FIRE-Final Inspection | 11/13/2000 | 11/14/2000 | 11/14/2000 | P | FAIL |
Joe Tawney
|
|
|
###-####. Final Fail C/N issued 11/15/2000 8:05:26 AM
|
BLD-Framing/Rough-in | 10/31/2000 | 11/2/2000 | 11/2/2000 | A | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 10/31/2000 at 11:25:12. Contact: ###-####. kit grid ok kit occ wall ok 11/2/2000 9:52:33 AM
|
BLD-Framing/Rough-in | 9/8/2000 | 9/11/2000 | 9/11/2000 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 09/08/2000 at 14:53:11. Contact: ###-####.
ok to cover int. walls in kitchen area...etc.,,,,,,,mech. rouph to be done later b-4 ceiling,, verify more braces on short wall top plate. 9/11/2000 10:38:46 AM
|
BLD-Framing/Rough-in | 8/11/2000 | 8/14/2000 | 8/14/2000 | A | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 08/11/2000 at 09:53:55. Contact: ###-####.grid clg ok 8/14/2000 5:20:09 PM
|
BLD-Framing/Rough-in | 8/10/2000 | 8/11/2000 | 8/11/2000 | A | NR |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 08/10/2000 at 17:06:02. Contact: ###-####.
|
FIRE-Final Inspection | 8/10/2000 | 8/11/2000 | 8/11/2000 | A | PART |
Joe Tawney
|
|
|
Scheduled by a contractor via Hello! on 08/10/2000 at 15:47:13. Contact: ###-####. Ok to occupy seating area while other construction continues. 8/11/00 2:54:15 PM
|
BLD-Framing/Rough-in | 8/9/2000 | 8/10/2000 | 8/10/2000 | P | CANC |
Russ Owen
|
|
|
###-#### kent--fr
|