BLD-Final | 5/4/2000 | 5/5/2000 | 5/5/2000 | A | FAIL |
Russ Owen
|
|
|
Duane ###-#### Handrail clearance to wall 1 1/2" minimum, not corrected. 5/5/00 1:45:28 PM
|
BLD-Final | 5/5/2000 | 5/5/2000 | 5/5/2000 | P | PASS |
Russ Owen
|
|
|
CN made ok LC # 19239 issued.
|
BLD-Final | 4/27/2000 | 4/28/2000 | 4/28/2000 | A | FAIL |
Russ Owen
|
|
|
Dwayne ###-####. Posted C/N.
|
BLD-Final | 4/24/2000 | 4/25/2000 | 4/25/2000 | P | CANC |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 04/24/2000 at 16:34:49. Contact: ###-####. Not ready 4/26/00 11:52:15 AM
|
BLD-Energy code compliance | 2/23/2000 | 2/24/2000 | 2/24/2000 | P | PASS |
Tom Arcoraci
|
|
|
###-####
|
BLD-Framing/Rough-in | 2/22/2000 | 2/23/2000 | 2/23/2000 | A | FAIL |
Tom Arcoraci
|
|
|
###-#### Not ready. 2/24/00 11:03:35 AM
|
BLD-Framing/Rough-in | 2/23/2000 | 2/23/2000 | 2/23/2000 | P | PASS |
Tom Arcoraci
|
|
|
###-####
|
BLD-Framing/Rough-in | 2/22/2000 | 2/22/2000 | 2/22/2000 | P | FAIL |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 02/22/2000 at 08:20:55. Contact: ###-####. C/N issued. 2/23/00 1:44:21 PM
|
BLD-Framing/Rough-in | 2/10/2000 | 2/11/2000 | 2/11/2000 | A | PART |
Jim Storey
|
|
|
SHEAR PANEL\\###-#### Exterior shear ok. 2/14/00 12:08:09 PM
|
BLD-Footing | 1/25/2000 | 1/25/2000 | 1/25/2000 | A | CANC |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 01/25/2000 at 06:25:39. Contact: ###-####. Done by 338. 1/25/00 1:45:18 PM
|