BLD-Final | 2/23/2000 | 2/24/2000 | 2/24/2000 | A | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 02/23/2000 at 12:19:02. Contact: ###-####.
|
FIRE-Final Inspection | 2/22/2000 | 2/23/2000 | 2/23/2000 | A | PASS |
Joe Tawney
|
|
|
Scheduled by a contractor via Hello! on 02/22/2000 at 10:03:11. Contact: ###-####. Final ok for perm. occ. 2/24/00 10:58:08 AM
|
BLD-Energy code compliance | 2/7/2000 | 2/8/2000 | 2/8/2000 | P | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 02/07/2000 at 11:28:55. Contact: ###-####.
|
BLD-Framing/Rough-in | 2/4/2000 | 2/7/2000 | 2/7/2000 | A | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 02/04/2000 at 18:45:45. Contact: ###-####. Ok to insulate. 2/7/00 1:35:07 PM
|
BLD-Framing/Rough-in | 2/4/2000 | 2/4/2000 | 2/4/2000 | P | CANC |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 02/04/2000 at 09:50:03. Contact: ###-####. Recall for Monday. 2/7/00 1:28:16 PM
|