BLD-Final | 8/22/2000 | 8/22/2000 | 8/22/2000 | P | PASS |
Russ Owen
|
|
|
Terry, ###-#### - reinspect
|
BLD-Final | 8/21/2000 | 8/21/2000 | 8/21/2000 | P | FAIL |
Russ Owen
|
|
|
Terry ###-#### crawl space walls not tight to rim insulation. 8/21/2000 3:34:02 PM
|
BLD-Final | 8/8/2000 | 8/9/2000 | 8/9/2000 | A | CANC |
Tom Arcoraci
|
|
|
Terry, ###-####
|
BLD-Final | 8/9/2000 | 8/9/2000 | 8/9/2000 | P | FAIL |
Russ Owen
|
|
|
Terry ###-####
|
BLD-Final | 7/19/2000 | 7/20/2000 | 7/20/2000 | A | FAIL |
Russ Owen
|
|
|
Terry, ###-#### C/N posted 7/20/00 2:40:20 PM
|
BLD-Framing/Rough-in | 3/23/2000 | 3/23/2000 | 3/23/2000 | P | PASS |
Russ Owen
|
|
|
mike ###-####3 r/i
|
BLD-Framing/Rough-in | 3/21/2000 | 3/21/2000 | 3/21/2000 | P | FAIL |
Jim Sly
|
|
|
Mike ###-#### C/N...foam/seal, need truss eng. 3/22/00 9:48:39 AM
|
BLD-Framing/Rough-in | 3/8/2000 | 3/9/2000 | 3/9/2000 | A | PASS |
Wes Worcester
|
|
|
mike ###-#### shear n Shear ok. 3/14/00 11:01:46 AM
|
BLD-Foundation | 1/27/2000 | 1/27/2000 | 1/27/2000 | P | PART |
Russ Owen
|
|
|
hris ###-#### poured before insp 1/28/00 1:17:41 PM
|
BLD-Footing | 1/25/2000 | 1/26/2000 | 1/26/2000 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 01/25/2000 at 13:32:55. Contact: ###-####. No approved plans, rebar not in. 1/26/00 2:42:57 PM
|
BLD-Footing | 1/25/2000 | 1/25/2000 | 1/25/2000 | P | NR |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 01/25/2000 at 10:36:41. Contact: ###-####. Nothing at the site. 1/26/00 2:23:20 PM
|