BLD-Final | 11/8/2000 | 11/9/2000 | 11/9/2000 | A | PASS |
Jim Sly
|
|
|
FN OCC- RICHARD- ###-#### OK for Perm. Occ. 11/9/2000 11:10:45 AM
|
BLD-Final | 11/8/2000 | 11/7/2000 | 11/7/2000 | P | PASS |
Joe Tawney
|
|
|
Added by Inspector: 406 On 11/8/2000 Reinsp OK for certificate of completion
|
BLD-Final | 10/30/2000 | 10/27/2000 | 10/27/2000 | P | FAIL |
Joe Tawney
|
|
|
Added by Inspector: 406 On 10/30/2000 Final Fail Fire/Smoke dampers
|
BLD-Framing/Rough-in | 5/18/2000 | 5/19/2000 | 5/19/2000 | P | PART |
Jim Sly
|
|
|
###-#### OK to rock 2nd floor & 1 side corridor 5/22/00 10:42:38 AM
|
BLD-Conference | 5/1/2000 | 5/2/2000 | 5/2/2000 | P | PASS |
Jim Sly
|
|
|
###-#### Discuss type V 1hr. & stairs 5/3/00 3:41:54 PM
|
BLD-Framing/Rough-in | 4/28/2000 | 5/1/2000 | 5/1/2000 | P | FAIL |
Jim Sly
|
|
|
richard ###-#### fr. C/N provide app. plans- need nailing schedule for gyp. ceiling.
|
BLD-Framing/Rough-in | 4/26/2000 | 4/27/2000 | 4/27/2000 | A | PART |
Carl Dependahl
|
|
|
RICHARD ###-#### SHEAR NAIL & TRUSSES Ceiling ok to begin cover- (1st layer) 4/28/00 2:59:45 PM
|
BLD-Framing/Rough-in | 4/26/2000 | 4/26/2000 | 4/26/2000 | P | FAIL |
Tom Arcoraci
|
|
|
shear nailing on roof and truss bracing ###-#### Richard Evans No app. plans 4/28/00 8:52:56 AM
|
BLD-Framing/Rough-in | 4/17/2000 | 4/18/2000 | 4/18/2000 | A | PART |
Jim Sly
|
|
|
richard Evans ###-#### Shear nailing ext. walls ok. 4/18/00 2:03:17 PM
|
BLD-Framing/Rough-in | 4/12/2000 | 4/13/2000 | 4/13/2000 | P | FAIL |
Jim Sly
|
|
|
###-#### C/N need engineering calcs. to verify cmst. straps & location of roof diaphram 4/14/00 10:53:17 AM
|
BLD-Foundation | 3/2/2000 | 3/2/2000 | 3/2/2000 | P | PASS |
Jim Sly
|
|
|
dane--###-#### found
|
BLD-Footing | 3/1/2000 | 3/1/2000 | 3/1/2000 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 03/01/2000 at 06:55:46. Contact: ###-####. Footing appears ok. 3/1/00 12:43:12 PM
|
BLD-Footing | 2/29/2000 | 2/29/2000 | 2/29/2000 | P | FAIL |
Jim Sly
|
|
|
###-#### Not ready (rain) 3/1/00 11:06:51 AM
|