BLD-Energy code compliance | 4/12/2000 | 4/13/2000 | 4/13/2000 | P | PASS |
Russ Owen
|
|
|
Ross ###-#### Already done 4/14/00 10:50:26 AM
|
BLD-Framing/Rough-in | 4/12/2000 | 4/13/2000 | 4/13/2000 | A | PASS |
Russ Owen
|
|
|
Ross ###-####
|
BLD-Framing/Rough-in | 4/10/2000 | 4/11/2000 | 4/11/2000 | A | CANC |
Russ Owen
|
|
|
russell ###-#### Was done on 4/10/00 4/11/00 1:56:34 PM
|
BLD-Framing/Rough-in | 4/7/2000 | 4/10/2000 | 4/10/2000 | A | NR |
Russ Owen
|
|
|
ross ###-#### fr Need electrical before a frame insp. 4/11/00 10:45:47 AM
|
BLD-Framing/Rough-in | 3/27/2000 | 3/28/2000 | 3/28/2000 | A | PASS |
Wes Worcester
|
|
|
PARIMETER WAS NOT NAILED AT 1 3/4 //###-#### Shear being restapled 3/28/00 1:36:44 PM
|
BLD-Framing/Rough-in | 3/23/2000 | 3/24/2000 | 3/24/2000 | P | FAIL |
Wes Worcester
|
|
|
shear wall ross ###-#### Not ready 3/27/00 9:58:50 AM
|
BLD-Foundation | 2/10/2000 | 2/11/2000 | 2/11/2000 | P | PART |
Russ Owen
|
|
|
###-#### LOGAN\\WILL POUR 3:30 Work not complete at this time, wanted a 3:30 inspection. 2/14/00 2:01:31 PM
|
BLD-Footing | 2/8/2000 | 2/9/2000 | 2/9/2000 | P | PASS |
Wes Worcester
|
|
|
Russell- ###-####.
|