BLD-Final | 4/4/2000 | 4/4/2000 | 4/4/2000 | P | PASS |
Jim Sly
|
|
|
###-#### Ok for perm. occ. 4/5/00 8:37:29 AM
|
Permanent Occupancy | | 4/4/2000 | 4/4/2000 | | DONE |
|
|
|
|
BLD-Final | 3/31/2000 | 3/31/2000 | 3/31/2000 | P | FAIL |
Carl Dependahl
|
|
|
###-#### Need card & plan...recalll 4/3/00 8:53:22 AM
|
FIRE-Alarm Testing | 3/30/2000 | 3/30/2000 | 3/30/2000 | P | PASS |
Joe Tawney
|
|
|
###-#### Reinsp. ok for perm. occ. existing alarm system to be upgraded. 3/31/00 8:48:47 AM
|
FIRE-Final Inspection | 3/29/2000 | 3/29/2000 | 3/29/2000 | P | FAIL |
Joe Tawney
|
|
|
###-#### Reinsp. fail fire extinguisher & alarm system test. 3/30/00 10:58:09 AM
|
BLD-Final | 3/27/2000 | 3/27/2000 | 3/27/2000 | P | PASS |
Russ Owen
|
|
|
###-#### Brian this is a test 3/29/00
|
FIRE-Final Inspection | 3/27/2000 | 3/27/2000 | 3/27/2000 | P | FAIL |
Joe Tawney
|
|
|
###-#### Final fail alarm system, smoke seals, sprkl over spacing. 3/28/00 9:10:40 AM
|
BLD-Framing/Rough-in | 3/22/2000 | 3/23/2000 | 3/23/2000 | A | FAIL |
Jim Sly
|
|
|
###-#### C/N firestop corridor 3/23/00 1:39:08 PM
|
BLD-Framing/Rough-in | 3/20/2000 | 3/20/2000 | 3/20/2000 | P | PART |
Tom Arcoraci
|
|
|
ceiling grid ###-#### Grid in corridor ok 3/21/00 9:31:37 AM
|
BLD-Framing/Rough-in | 3/16/2000 | 3/17/2000 | 3/17/2000 | P | FAIL |
Jim Sly
|
|
|
ceiling grid brian ###-#### Not ready. 3/20/00 10:19:58 AM
|
BLD-Framing/Rough-in | 3/7/2000 | 3/8/2000 | 3/8/2000 | A | PASS |
Jim Sly
|
|
|
###-####
|
BLD-Framing/Rough-in | 3/3/2000 | 3/3/2000 | 3/3/2000 | P | FAIL |
Tom Arcoraci
|
|
|
bryan ###-#### Ok to cover all but elec. panel. 3/6/00 11:40:34 AM
|
BLD-Framing/Rough-in | 3/1/2000 | 3/2/2000 | 3/2/2000 | P | FAIL |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 03/01/2000 at 13:12:02. Contact: ###-####. C/N architect address elect. panel membrane penitr. (corridor). 3/3/00 8:40:21 AM
|